background image

32

198935 R17

5.4. SeedStor-K Ladder Make-Up Packages

Figure 13.

SeedStor-K Ladder Make-Up Package Details

SECTION “B”

SEED STOR K LADDER MAKE-UP PACKAGES

NOTE:

1.

Assemble upper ladder and cage tiers as indicated in the Wide Cor Ladder Manual (P/N 198925)

TRIM BOTTOM LADDER
TO FIT IF NECESSARY 

POSITION LADDER SUPPORTS 
CHANNELS SO THAT THEY DO
NOT LINE UP WITH HOPPER LEGS 

USE IN CONJUNCTION WITH
BLOCK-OFF PLATE (P/N 234530) 

ANGLE BRACKET

P/N 234522



   

 


  



 
 



   



 


 



 

 

P

ag

C1

See Note 

2

Note

1. Assemble the upper ladder and cage tiers as indicated in the Wide-Corr® ladder manual (198925).

2. Apply a warning label as shown in

Section 5.2 – Ladder System Safety Requirements on page 21

.

3. For 15’ Seed Stor K see

Section 5.4.1 – SeedStor-K Ladder Make-Up Package - 15' x 45° on page 33

4. For 18’ Seed Stor K see

Section 5.4.2 – SeedStor-K Ladder Make-Up Package - 18' x 45° on page 34

5. For 21’ and 24’ Seed Stor K see

Section 5.4.3 – SeedStor-K Ladder Make-Up Package - 21' x 45° and

24' x 40° on page 35

6. For 27’ Seed Stor K see

Section 5.4.4 – SeedStor-K Ladder Make-Up Package 27' x 40° on page 36

5. ASSEMBLY

HOPPER LADDER MAKE-UP PACKAGES – WIDE-CORR® GRAIN BIN

Содержание Westeel Wide-Corr

Страница 1: ...ference Part Number 198935 R17 Revised February 2022 Original Instructions Hopper Ladder Make Up Packages Wide Corr Grain Bin Installation and Storage Instructions Part Number 198925 Revision 20 Revis...

Страница 2: ...n this Manual The following changes have been made in this revision of the manual Description Section Updated vertical support ladder details Section 6 2 Optional Vertical Support Ladder Details on pa...

Страница 3: ...ipment 19 4 3 Order Optional Equipment 19 5 Assembly 20 5 1 Assembly Safety 20 5 2 Ladder System Safety Requirements 21 5 3 Welded Hopper Ladder Make Up Packages 22 5 3 1 Welded Hopper Make Up Package...

Страница 4: ...HOPPER LADDER MAKE UP PACKAGES WIDE CORR GRAIN BIN 4 198935 R17 6 2 Optional Vertical Support Ladder Details 39 6 3 Ladder Parts Identification 41 7 Limited Warranty Westeel Grain Bin Products 42...

Страница 5: ...this Westeel Hopper Ladder Make Up Packages Everyone present at the assembly site is required to be familiar with all safety precautions Keep this manual available for frequent reference and review it...

Страница 6: ...if not avoided may result in property damage 2 2 General Safety Information Read and understand all safety instructions safety decals and manuals and follow them when assembling the equipment Only ex...

Страница 7: ...ome illegible See decal location figures that follow Replaced parts must display the same decal s as the original part Replacement safety decals are available free of charge from your distributor deal...

Страница 8: ...that follow Safe operation and use of the hopper ladder requires that you familiarize yourself with the various safety decals and the areas or particular functions that the decals apply to as well as...

Страница 9: ...Shut off and lock out all power 2 Use a lifeline safety harness and have an observer outside before entering the bin 3 Wear proper breathing equipment or a respirator 4 Avoid the center of the bin Fai...

Страница 10: ...0 00228 When equipped with aeration system to prevent roof and or bin damage Use a minimum 1 square foot 0 1m2 opening for each 1000ft3 min 30m3 min of air Ensure all roof vents are open and unobstruc...

Страница 11: ...rades are available Table 1 Peak Loads for Various Roofs Size Type of Roof Load lbs Load kg 15 to 24 non structural 4000 lbs 1814 kg 27 to 48 non structural 5000 lbs 2268 kg 51 54 non structural 8000...

Страница 12: ...1 39 18 29 1 39 21 24 1 15 40 1 92 24 17 0 81 27 1 29 27 10000 44 5 19 0 91 28 1 34 30 15 0 72 24 1 15 33 1 58 33 18 0 86 24 1 15 36 1 72 36 18 0 86 23 1 10 31 1 48 39 16 0 77 21 1 01 30 1 44 42 14 0...

Страница 13: ...96 37 1 77 102 32 1 53 105 32 1 53 108 32 1 53 Table 5 Maximum Roof Snow Load at UPGRADED Peak Loads Bin Series Upgraded Peak Load Standard Roof lbs kN psf kPa 48 60000 266 9 38 1 82 51 38 1 82 54 38...

Страница 14: ...nditions Westeel will not assume any liability for results arising from their use Important Foundation should be uniform and level Level should not vary by more than over a span of four feet under the...

Страница 15: ...ring of a non stiffened bin or tank and b shimming under the uprights of a stiffened bin or tank or under the legs of a hopper 4 Make sure that the proper hardware is utilized for all bolted connectio...

Страница 16: ...tween surfaces and develop white rust 3 White rust is not a structural concern if its development is stopped in the early stages A light film or powdery residue can occur after a period of heavy rainf...

Страница 17: ...parts inside If Parts Become Wet 1 If goods become submerged or wet the bundles should be opened as soon as possible sheets or material separated and dried Keep separated until assembly Brace goods p...

Страница 18: ...oaded from the center Contact local power officials for minimum power line clearance See Section 3 5 Critical Assembly Requirements on page 15 for mandatory siting and assembly requirements Store only...

Страница 19: ...arge pocket carpenter pouch 8 20 cm metal punches for aligning bolt holes Step and extension ladders construction grade 6 point wrenches Imperial box end Metal cutting saw suitable for cutting roof ri...

Страница 20: ...el surface Always have two or more people assembling the hopper ladder Make sure you have sufficient lighting for the work area Tighten all fasteners according to their specifications Do not replace o...

Страница 21: ...ortant Regulations require that fixed ladders over a certain height must be outfitted with platforms and cages or other approved fall arresting devices For information on the specific requirements app...

Страница 22: ...5 3 1 Welded Hopper Make Up Package 14 x 35 on page 23 4 For 15 welded hopper see Section 5 3 2 Welded Hopper Make Up Package 15 x 35 on page 24 5 For 16 welded hopper see Section 5 3 3 Welded Hopper...

Страница 23: ...R TO THE SUPPORT CHANNELS SECTION A A BOTTOM CAGE HOOP P N 234162 BLOT TO SC LADDER CLIP LADDER LADDER SUPPORT CHANNEL WALL SHEET HOPPER RING BEAM 3 8 x 1 BOLT A A NOTE HOLES ON THE TOP OF SUPPORT CHA...

Страница 24: ...SHEET HOPPER RING BEAM 3 8 x 1 BOLT A A NOTE HOLES ON THE TOP OF SUPPORT CHANNELS ALIGN BOLT WITH MATING HOLES ON THE LADDER SEGMENT HOPPER RING BEAM NO LADDER CLIPS ARE REQUIRED AT THIS LOCATION DET...

Страница 25: ...P N 234162 LADDER WALL SHEET HOPPER RING BEAM 3 8 x 1 BOLT A A NOTE HOLES ON THE TOP OF SUPPORT CHANNELS ALIGN BOLT WITH MATING HOLES ON THE LADDER SEGMENT HOPPER RING BEAM NO LADDER CLIPS ARE REQUIRE...

Страница 26: ...162 BOLT TO SUPPORT CHANNELS LADDER LADDER SUPPORT CHANNEL WALL SHEET HOPPER RING BEAM 3 8 x 1 BOLT A A NOTE HOLES ON THE TOP OF SUPPORT CHANNELS ALIGN BOLT WITH MATING HOLES ON THE LADDER SEGMENT HOP...

Страница 27: ...SUPPORT CHANNELS P N 234491 SO THAT FLANGES POINT OUTWARDS USE 3 8 x 1 BOLTS TO SECURE LADDER TO THE SUPPORT CHANNELS SECTION A A STANDARD CAGE HOOP P N 234161 BLOT TO SC LADDER CLIP LADDER LADDER SU...

Страница 28: ...DDER INSTALL SUPPORT CHANNELS P N 234492 SO THAT FLANGES POINT OUTWARDS USE 3 8 x 1 BOLTS TO SECURE LADDER TO THE SUPPORT CHANNELS SECTION A A LADDER LADDER SUPPORT CHANNEL 4 0 WC LADDER CLIP STANDARD...

Страница 29: ...34161 LADDER WALL SHEET HOPPER RING BEAM 3 8 x 1 BOLT A A NOTE HOLES ON THE TOP OF SUPPORT CHANNELS ALIGN BOLT WITH MATING HOLES ON THE LADDER SEGMENT HOPPER RING BEAM NO LADDER CLIPS ARE REQUIRED AT...

Страница 30: ...4161 LADDER WALL SHEET HOPPER RING BEAM 3 8 x 1 BOLT A A NOTE HOLES ON THE TOP OF SUPPORT CHANNELS ALIGN BOLT WITH MATING HOLES ON THE LADDER SEGMENT HOPPER RING BEAM NO LADDER CLIPS ARE REQUIRED AT T...

Страница 31: ...ion Details Page B5 SECTION A4 ANGLE BRACKET ATTACHMENT FOUNDATION DETAILS LADDER 3 8 x 1 BOLT SUPPORT CHANNEL ANGLE BRACKET ANGLE BRACKET CONCRETE PAD OPTION WITH ANCHOR BOLTS NOT INCLUDED B B STEEL...

Страница 32: ...Note 2 Note 1 Assemble the upper ladder and cage tiers as indicated in the Wide Corr ladder manual 198925 2 Apply a warning label as shown in Section 5 2 Ladder System Safety Requirements on page 21 3...

Страница 33: ...ADDER INSTALL SUPPORT CHANNELS P N 234526 SO THAT FLANGES POINT OUTWARDS USE 3 8 x 1 BOLTS TO SECURE LADDER TO THE SUPPORT CHANNELS SECTION A A LADDER LADDER SUPPORT CHANNEL 4 0 WC LADDER CLIP STANDAR...

Страница 34: ...N 234161 LADDER WALL SHEET HOPPER RING BEAM 3 8 x 1 BOLT A A NOTE HOLES ON THE TOP OF SUPPORT CHANNELS ALIGN BOLT WITH MATING HOLES ON THE LADDER SEGMENT HOPPER RING BEAM NO LADDER CLIPS ARE REQUIRED...

Страница 35: ...OF SUPPORT CHANNELS ALIGN BOLT WITH MATING HOLES ON THE LADDER SEGMENT HOPPER RING BEAM NO LADDER CLIPS ARE REQUIRED AT THIS LOCATION DETAIL 1 ANGLE BRACKET P N 234522 19 3 FOR 21 13 8 FOR 24 HOLES IN...

Страница 36: ...LADDER WALL SHEET HOPPER RING BEAM 3 8 x 1 BOLT A A NOTE HOLES ON THE TOP OF SUPPORT CHANNELS ALIGN BOLT WITH MATING HOLES ON THE LADDER SEGMENT HOPPER RING BEAM NO LADDER CLIPS ARE REQUIRED AT THIS...

Страница 37: ...ation Details Page C5 SECTION B4 ANGLE BRACKET ATTACHMENT FOUNDATION DETAILS LADDER 3 8 x 1 BOLT SUPPORT CHANNEL ANGLE BRACKET ANGLE BRACKET CONCRETE PAD OPTION WITH ANCHOR BOLTS NOT INCLUDED B B STEE...

Страница 38: ...2 1 234484 24 x 35 4 4 1 1 2 1 234485 27 x 35 4 4 2 2 1 234536 15 x 45 4 4 1 1 2 1 234537 18 x 45 4 4 1 1 2 1 234538 21 x 45 24 x 40 4 4 2 2 1 234486 27 x 40 5 6 1 1 1 2 1 Table 7 Wide Corr Hopper La...

Страница 39: ...s or Less Hopper Size of Legs Hopper Ht ft Rows of Supports Needed For Ladder Configuration Needed For Span Between 2 Legs Stiffened SSK 15 Dia 10 9 2 3 3 1 18 Dia 12 10 6 3 3 1 21 Dia 14 12 1 4 4 1 W...

Страница 40: ...rews 3 8 dia min for spans greater than 60 Please see Wide Corr Ladder Installation Manual 198925 for further installation details of vertical ladders For every one of 234568 or 234569 purchased you w...

Страница 41: ...dder to Wall Clip 234504 Ladder Support Arm 1 Dia x 34 3 4 Long 234505 Ladder Pass Thru Rail 234514 16 Ladder Cage Support 234517 Ladder Support Arm Clip 234518 Ladder Support Arm Bracket 234519 Inter...

Страница 42: ...months Structural 30 months Elite Cones Paint 30 months Structural 10 years WESTEEL cones Paint No Warranty Structural 12 months Smooth Wall Bins Paint 60 months Structural 10 years Commercial Smooth...

Страница 43: ...mers Limitations as to Manufacturer The warranty does not cover products sold by Westeel that are not manufactured by Westeel In those circumstances the purchaser is referred to the manufacturer of th...

Страница 44: ...forceable in whole or in part such provision shall be deemed severable and will not affect or impair the legal validity of any other provision of the warranty 7 LIMITED WARRANTY WESTEEL GRAIN BIN PROD...

Страница 45: ...198935 R17 45 HOPPER LADDER MAKE UP PACKAGES WIDE CORR GRAIN BIN 7 LIMITED WARRANTY WESTEEL GRAIN BIN PRODUCTS...

Страница 46: ...ertilizer grain and feed systems with a growing platform in providing equipment and solutions for food processing facilities AGI has manufacturing facilities in Canada the United States the United Kin...

Отзывы: