48
BU-0101704 R3
Figure 38.
Mount Powerhead on the Underfloor Auger
6.11. Assemble the Incline Powerhead
Æ
When equipped with an incline powerhead:
1. Pull out the underfloor flighting far enough to access the two holes in the end of flighting. Install the
transition stub shaft with the following hardware, and tighten securely (see
8" Tube Unload:
two 7/16" x 2-1/4" bolts and nylon locknuts
10" Tube Unload:
two 1/2" x 2-3/4" bolts and nylon locknuts
Figure 39.
Installing the Transition Stub Shaft
15
13
16
14
15
13
16
14
4
2
3
4
1
3
EASYFLOW2 (100 SERIES) – FARM TUBE BIN UNLOAD SYSTEM