![AGI Batco BCX2 Скачать руководство пользователя страница 47](http://html1.mh-extra.com/html/agi/batco-bcx2/batco-bcx2_operators-manual_2866991047.webp)
8210-00001 R0
47
•
When cranking out (counterclockwise) = no clicking and ratchet pawl fully engaged into gear teeth.
To Replace the Lift Cable:
1. Unwind the winch drum until cable is slack and remove all cable clamps.
2. Free the cable from the winch and pulleys.
3. Remove the cable clamps that secure the hook in place.
4. Reverse the above steps to install the new cable.
PTO TOP-DRIVE FIELD LOADER – PORTABLE GRAIN BELT CONVEYOR