68
P1512115 R8
Figure 47.
Routing Cable through Motor Mount Pipe (if equipped with Hand Winch)
4.23. Align the Winch
This procedure describes the alignment of the winch.
1. Check the alignment of the winch by watching the cable wrapping on the drum as the conveyor is raised.
Proper alignment is achieved when the cable indexes, filling each row on the drum evenly and not piling up
against one side.
2. Lower the conveyor fully if the cable does not index properly until there is slack in the cable.
3. Loosen the bolts holding the winch, adjust the winch, re-tighten bolts and retest.
4.24. Install the Over-Mount Gas/Electric Drive
This procedure describes the installation of the over-mount gas drive or electric drive.
Æ
See
for a list of procedures required to install the gas drive.
Æ
See
for a list of procedures required to install electric drive.
Table 25.
Gas Drive Installation Procedures
Item
Procedures
1
Section 4.24.1 – Install the Motor Mount on page 69
2
Section 4.24.2 – Install the Gearbox on page 70
PORTABLE GRAIN BELT CONVEYOR – FIELD LOADER