36
P1512161 R0
Figure 26.
Installing the Hopper Cloth onto the Conveyor
7. Open split loom (7) along the slit and snap over the upper frame to secure hopper cloth.
3.12. Install the Collapsible Hopper Cloth Controls
Install the Handle
1. Attach the hopper handle (1) to the handle mount using a 3/8" x 1–1/2" bolt (2), 3/8" nylon washer (3), and
two 3/8" hex nuts (4) (see
).
Note
Ensure the handle can pivot after tightening the bolt.
Table 9.
Handle Components
Item
Description
1
Hopper Handle
2
3/8" x 1–1/2" Hex Bolt
3
3/8" Nylon Washer (USS)
4
3/8" Hex Nut
SWING AWAY CONVEYOR – PORTABLE GRAIN BELT CONVEYOR