Charts for general radiography QC
Determination of Operating Levels
Imager Type: __________
Serial #: _________________
Date ____________________
Film Type: ____________
Emulsion #: ______________
Densitometer: ________________ (default selection)
Day 1
Day 2
Day 3
Day 4
Day 5
Month
Day
Initials
Low Density
Average of 5 Values = calculated reference L ow De nsi ty l evel
Mid Density
Average of 5 Values = calculated reference "Mid Density" level
High Density
Average of 5 Values = calculated reference Hi gh De nsi ty l evel
Step 1:
Print QC Test images on five consecutive days. Record the optical densities
measurements in the tables below. After five days, average the values to determine
the reference levels for each of the parameters.
Step 2:
Copy the calculated reference levels to Charts 2A/B (’Daily Density Control Chart’)
General radiography applications
Input Tray: _______________
Quality Control for
Chart 1
Figure 10: Chart 1, Determination of Operating Levels
130
| DRY 3.4 | Quality Control Charts
2602A EN 20191018 0826
Содержание 5364/500
Страница 1: ...DRY 3 4 5364 500 User Manual 2602A EN 20191018 0826 ...
Страница 12: ...12 DRY 3 4 DRY 3 4 2602A EN 20191018 0826 ...
Страница 35: ...Compliance Topics General Safety Electromagnetic Compatibility DRY 3 4 Introduction 35 2602A EN 20191018 0826 ...
Страница 58: ... Audio signals The keypad The display 58 DRY 3 4 Introduction 2602A EN 20191018 0826 ...
Страница 87: ...The menu structure DRY 3 4 Advanced Operation key operator mode 87 2602A EN 20191018 0826 ...
Страница 125: ... Cables transducers and accessories DRY 3 4 Remarks for HF emission and immunity 125 2602A EN 20191018 0826 ...
Страница 160: ...4 Open the upper lower input tray 160 DRY 3 4 Plug Play Installation Manual 2602A EN 20191018 0826 ...