4. Installation
continued
Step 9:
install the flue cover bracket 150mm down
from the ceiling. (Refer figure 8)
Step 10:
Installing the flexible duct to the solid duct
and connecting the 3 way junction.
Install the joiner to the bottom of the solid
ducts and secure with screws leaving about half
of the joiner out the bottom to allow for the
flexible ducts to connect to. (Refer figure 9)
Connect one end of the flexible duct to the
stating pop on the rangehood. Secure this
with some PVC duct tape. (Refer figure 9)
Pass the flexible duct through the hole in
the ceiling and connect to the 3 way joiner.
Secure with PVC duct tape.
Connect the flexible to the solid ducting and
the 3 way joiner and secure with PVC duct
tape.
If you need to install the flexible duct with
a bend do not make the bend to sharp as
this can restrict airflow. (Refer figure 11 as an
example for correct instalment of bend)
Step 11:
Install the rubber dektite over the solid duct.
Do not fix down at this point refer step 13.
(This can be purchased at additional cost via
our online store: www.agradefinish.com.au)
PAGE 5
AGF Professional 1500
Figure 9
Figure 10
Figure 11
Figure 8
Содержание Professional 1500
Страница 12: ......