![AGCO Cumberland Flex-Flo 220 Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/agco/cumberland-flex-flo-220/cumberland-flex-flo-220_installation-manual_2866401018.webp)
3. Installation
18
PNEG-2339
Flex-Flo Unloader Kit
Feed Tank Collar
The standard bulk feed tank is supplied with a 16'' (40.64 cm) hopper opening. If needed, 22'' (55.88 cm)
hopper openings are also available. Consult the dealer for specific ordering instructions.
Adjusting the Restrictor Tube
IMPORTANT:
The restrictor may be adjusted to allow more feed flow. Do Not modify the restrictor until
the system is completely operational and the auger has been polished by running feed
through the system.
1. Remove the 1/4" x 5/8" bolt (3) and auger lock (24). After that, remove the restrictor tube (25) from
the spindle (26).
2. Measure 1" (2.5 cm) from the unloader assembly (23) wall and cut the restrictor tube (25).
3. Install the restrictor tube (25) back to the spindle (26) with 1/4" x 5/8" bolt (3) and auger lock (24).
4. Test the feed flow through the unloader assembly (23).
5. If the desired feed flow rate is not attained, repeat the
until the desired rate is reached.
Figure 3P Adjusting the Restrictor Tube
Ref #
Description
3
1/4"-20 x 5/8" BHSCS Bolt (S-4309)
23
Unloader Assembly
24
Auger Lock
25
Restrictor Tube
26
Spindle
Содержание Cumberland Flex-Flo 220
Страница 24: ...24 PNEG 2339 Flex Flo Unloader Kit NOTES...