![AGA DESN 515906 Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/aga/desn-515906/desn-515906_servicing-instructions_2865645004.webp)
To ensure the best performance from your Rayburn. It
should be serviced once a year, preferably at the start of
the heating season.
This appliance must be commissioned by a competent
engineer, such as OFTEC approved.
Failure to install and maintain the appliance correctly
could lead to prosecution.
An additional flueway and combustion chamber clean
halfway through the heating season may be necessary
in some cases.
The Rayburn cannot be serviced whilst hot, so both
oven and boiler thermostats should be turned off on the
evening before the service visit.
Annual Service
During annual service flexible oil lines, burner nozzles
MUST BE CHANGED.
WIRING:
Ensure there is no damage or loose
connections. This should be carried out by a competent
engineer.
BURNER REMOVAL - for cleaning and inspection.
CLEANING - Boiler heat exchanger, flueways, oven and
hotplate flueways together with ceramic fibre burner
chambers.
BURNER SERVICING
OIL PUMP SERVICING - Cleaning of fuel line strainer.
RE-COMMISSIONING
REPLACEMENT PARTS
Additional Flueway Clean
It may be necessary in some installations to give the
boiler flueways a clean out at the end of the heating
season.
This appliance
MUST
be serviced at regular 12
monthly intervals to optimise its safety, efficiency and
performance.
4
INTRODUCTION
SERVICE SCHEDULE
Содержание DESN 515906
Страница 8: ...Cleaning 8 Fig 7 ALL BAFFLES MUST BE STACKED IN PLACE AS DIAGRAM ABOVE...
Страница 21: ...21 Fig 33 DESN 514774 Replacement of parts Electrical controls...
Страница 29: ...Fault Finding Fig 37A 29 DESN 516838...
Страница 30: ...30 Fault Finding...
Страница 31: ...31 Fault Finding...
Страница 33: ...33...
Страница 34: ...34...
Страница 35: ...35...
Страница 36: ......
Страница 37: ......
Страница 38: ......
Страница 39: ......