28
1
1
⁄
8
"
(28.4mm)
Typical
1
⁄
4
" (6.4mm) thick battens-
1
⁄
4
" (6.4mm) Plywood / Panel
3
⁄
16
" (4.8mm)
thick back up-
1
⁄
8
" (4.8mm)
thick back up-
1
⁄
4
" (6.4mm) Plywood / Panel
3
⁄
16
" (4.8mm) thick battens-
24
5
⁄
16
"
(61.8cm)
-
1
⁄
16
" (1.6mm) rout
2
3
⁄
16
"
(55.6mm)
1
⁄
2
" (12.7mm) Plywood / panel
5
⁄
16
"
(7.9mm)
Metal side panel
24"
(61cm)
typical installation
opening
Holes in
roller base-
#8 screws-
Cap-
Figure 33
Figure 34
Instructions for Fastening Side Panels to
freezer
1. Side panels should be 24" (61cm) deep or 24
5
⁄
16
"
(61.7cm) deep when tucked into the front trim.
2. Panel height to match installation height.
3.
Install the side panels per drawings on the right.
To avoid damage to panels or flooring, raise panels slightly,
to clear floor when installing.
Drill three (3) holes equal distance apart in vertical section
of aluminum frame and install pan head screws as shown.
Anchor side panel with screw as shown. Be sure screw
used goes no more than
1
⁄
2
inch deep into product. Do NOT
overtighten.
NOTE
Kick Plate Installation
Use two (2) #8 sheet metal screws (supplied) to facilitate
holding your kick plate in place. Mount screws in holes in
roller base. Cover screw heads with caps supplied. (See
Figure 34).
INSTALLING SIDE PANELS AND KICK PLATE
Содержание M48C2TF
Страница 35: ...35 NOTES...
Страница 71: ...35...