Commissioning
EN
WWG / WWG 1 / WWG 2
6
Commissioning
6.1
Commissioning the product
Verify that the control unit and the probe are properly mounted.
Verify that the control unit has been properly connected electrically.
Verify that the probe is properly connected to the control unit.
If you want to use the external acknowledgement, verify that the external
acknowledgement is properly connected.
If you want to use the relay, verify that the relay is properly connected.
Verify correct mains supply of the control unit.
Verify that the flat cable has been connected to the printed circuit board.
Verify that the control unit has been properly closed.
1. Switch on the power supply via the on-site mains fuse.
- The green LED lights up.
2. Perform a function test (see chapter "Function test").
Содержание WWG
Страница 10: ...10 Produktbeschreibung DE WWG WWG 1 WWG 2 4 2 Abmessungen 60 mm 65 mm 100 mm 188 mm 166 mm ...
Страница 32: ...32 Anhang DE WWG WWG 1 WWG 2 15 Anhang 15 1 EU Konformitätserklärung ...
Страница 42: ...10 Product description EN WWG WWG 1 WWG 2 4 2 Dimensions 60 mm 65 mm 100 mm 188 mm 166 mm ...
Страница 64: ...32 Appendix EN WWG WWG 1 WWG 2 15 Appendix 15 1 EC Declaration of Conformity ...