22
Maintenance
EN
PrimoSol® 130
8
Maintenance
8.1
Maintenance intervals
8.2
Maintenance activities
8.2.1
Replace circulation pump
1. Close the shut-off at the flow meter and set the blue ball valve to 90 °
position.
2. Replace the circulation pump.
3. Open the shut-off at the flow meter and set the blue ball valve to 0 °
position.
4. In the case of pressure loss in the system, refill solar liquid and recom-
mission the system.
When
Activity
Flow meter can no
longer be read
Drain, flush and fill the system.
Circulation pump is
defective
Replace the circulation pump.
Содержание PrimoSol 130 Series
Страница 9: ...9 Produktbeschreibung DE PrimoSol 130 4 2 Abmessungen Abbildung 3 PrimoSol 130 1 in mm ...
Страница 28: ...28 Anhang DE PrimoSol 130 14 Anhang 14 1 EG Konformitätserklärungen ...
Страница 37: ...9 Product description EN PrimoSol 130 4 2 Dimensions Fig 3 PrimoSol 130 1 in mm ...
Страница 56: ...28 Appendix EN PrimoSol 130 14 Appendix 14 1 EC Declaration of Conformity ...
Страница 65: ...9 Description du produit FR PrimoSol 130 4 2 Dimensions Figure 3 PrimoSol 130 1 en mm ...
Страница 78: ...22 Service FR PrimoSol 130 3 Refermez la soupape D dès que le liquide solaire s échappe ...
Страница 85: ...29 Annexe FR PrimoSol 130 14 Annexe 14 1 Déclaration de conformité CE ...
Страница 94: ...9 Descripción del producto ES PrimoSol 130 4 2 Dimensiones Imagen 3 PrimoSol 130 1 en mm ...
Страница 113: ...28 Anexo ES PrimoSol 130 14 Anexo 14 1 EG Konformitätserklärung ...
Страница 122: ...9 Descrizione del prodotto IT PrimoSol 130 4 2 Dimensioni Figura 3 PrimoSol 130 1 in mm ...
Страница 141: ...28 Appendice IT PrimoSol 130 14 Appendice 14 1 Dichiarazione di conformità CE ...
Страница 150: ...9 Opis produktu PL PrimoSol 130 4 2 Wymiary Ilustracja 3 PrimoSol 130 1 in mm ...
Страница 163: ...22 Eksploatacja PL PrimoSol 130 3 Ponownie zamknąć zawór D gdy tylko płyn solarny zacznie wypływać ...
Страница 170: ...29 Aneks PL PrimoSol 130 14 Aneks 14 1 Deklaracja zgodności CE ...