17
Commissioning
EN
ProCalida® EF 1
6
Commissioning
6.1
Commissioning the product
A
B
C
B
.Max.
1 1/2 x
Max.
1 1/2 x
E
D
1. Connect the hose (D) to the
end cap with the hose con-
nection or to the boiler filling
and drain valve KFE (E).
2. Open the white hand wheel
for filling and flushing.
3. Open the return valve of the
first heating circuit (A).
4. Slightly open the flow valve
of the first heating circuit
(C).
5. Close all other valves (B).
6. Fill the heating circuit with a
maximum of 5 bar and flush
it.
7. Fully open the flow valve (C)
as soon as water flows into
the heating circuit.
8. Close the flow valve and the
return valve of the filled
heating circuit.
9. Repeat the procedure 1 to 5
for filling and flushing for all
other heating circuits.
Содержание EF1
Страница 9: ... 327 mm 220 mm 30 mm 46 mm 79 mm 9 Produktbeschreibung DE ProCalida EF 1 ...
Страница 31: ... 327 mm 220 mm 30 mm 46 mm 79 mm 9 Product description EN ProCalida EF 1 ...
Страница 53: ... 327 mm 220 mm 30 mm 46 mm 79 mm 9 Description du produit FR ProCalida EF 1 ...
Страница 75: ... 327 mm 220 mm 30 mm 46 mm 79 mm 9 Descripción del producto ES ProCalida EF 1 ...
Страница 97: ... 327 mm 220 mm 30 mm 46 mm 79 mm 9 Descrizione del prodotto IT ProCalida EF 1 ...
Страница 119: ... 327 mm 220 mm 30 mm 46 mm 79 mm 9 Descrição do produto PT ProCalida EF 1 ...
Страница 141: ... 327 mm 220 mm 30 mm 46 mm 79 mm 9 Opis produktu PL ProCalida EF 1 ...