9
Mounting
EN
MS
5
Mounting
Only mount the product after having completed all pipe assembly work, all
welding work and all soldering work.
1. Flush the lines of the system before installing the product.
5.1
Preparing mounting
NOTICE
LEAKING PRODUCT
•
Verify that the pipe of the product has been thoroughly flushed prior to instal-
lation. Impurities and deposits such as weld beads, hemp, metal chips or
limescale cause leaks of the product.
Failure to follow these instructions can result in equipment damage.
Verify that the nominal pressure of the product corresponds to the speci-
fication value of the system.
Verify that the liquid in the system complies with the intended use.
Verify that liquid can escape via the discharge line during heating up.
Verify that the product has been mounted without a shut-off element.
- Do not install shut-off valves, filters or similar equipment.
Verify that the product is mounted in such a way that no external forces
can act on the components after it has been installed.
Содержание 42385
Страница 17: ...16 Anhang DE MS 14 Anhang 14 1 EU Konformitätserklärung ...
Страница 33: ...16 Appendix EN MS 14 Appendix 14 1 EU Declaration of Conformity ...
Страница 49: ...16 Annexe FR MS 14 Annexe 14 1 Déclaration de conformité UE ...
Страница 65: ...16 Aneks DE 14 Aneks 14 1 Deklaracja zgodności UE ...
Страница 81: ...16 Anexă RO MS 14 Anexă 14 1 Declarație de conformitate UE ...