13
Commissioning
EN
ProCalida® IN 1½
6.2
Performing the pressure test and the function test
1. Apply 6 bar of pressure to the system for a period of two hours.
2. Perform a leak test after two hours.
- The pressure drop must not exceed 0.2 bar.
3. Fill the system with water until the operating pressure is reached.
6.3
Adjusting the flow valves
6.3.1
With flow meter
1. Open the flow valve until the cal-
culated water volume (A) is indi-
cated at the flow meter.
2. Turn the ring all the way to the
mechanical stop of the flow valve.
A
Содержание ProCalida IN 1 1/2
Страница 11: ...11 Montage DE ProCalida IN 1 5 2 Produkt montieren Klick ...
Страница 16: ...16 Gewährleistung DE ProCalida IN 1 ...
Страница 27: ...11 Mounting EN ProCalida IN 1 5 2 Mounting the product Click ...
Страница 32: ...16 Warranty EN ProCalida IN 1 ...
Страница 43: ...11 Montage FR ProCalida IN 1 5 2 Montage du produit Clic ...
Страница 48: ...16 Garantie FR ProCalida IN 1 ...
Страница 59: ...11 Montaggio IT ProCalida IN 1 5 2 Montaggio del prodotto Clic ...
Страница 64: ...16 Garanzia IT ProCalida IN 1 ...