background image

Shut Down & Restart the Inverter

22

The inverter needs maintenance periodically, the following details should be 
noticed.
PV connection: check the PV connection twice a year 
AC connection: check the AC connection twice a year
Earth connection: check the Earth connection twice a year
Heat sink: clean the heat sink once a year with dry towel

·

Turn off the DC switch on the inverter;

·

Turn off the PV switch of the system;

·

Turn off the AC switch between inverter grid output and the public grid.

Follow the procedures below when the inverter needs to be restarted.

·

Follow the Shut Down Procedures of Article 6 to shut down inverter;

·

Follow the Commissioning Procedures of Article 5 to turn on the inverter.

7.Maintenance&Trouble Shooting 

6.Shut Down & Restart the Inverter

6.1 Shut Down Procedures 

7.1 Maintenance 

6.2 Restart the inverter 

Note:

The inverter will be operable after minimum 5 minutes.

Содержание HNS Series

Страница 1: ...Residential HNS series HNS 1000 1500 2000 2500 3000 3600 TL 1 HNS 3000 3600 4000 5000 TL Installation and Operation Manual On Grid PV Inverter Version 03 610100050113 V0 01 ...

Страница 2: ...ter 3 5 Electrical Connection 3 5 1 PV Connection 3 5 2 Grid Connection 3 5 3 Communication Connection WIFI Ethernet GPRS RS485 4 Operation 4 1 Control Panel 4 2 Menu Structure 4 3 Setting 4 3 1 Startup Setting 4 3 2 Parameter Setting 5 Commissioning 6 Shut Down Restart the Inverter 6 1 Shut Down Procedures 6 2 Restart the inverter 7 Maintenance Trouble Shooting 7 1 Maintenance 7 2 Fault Code and ...

Страница 3: ... MPPT Tracker HNS1000TL 1 HNS1500TL 1 HNS2000TL 1 HNS2500TL 1 HNS3000TL 1 HNS3600TL 1 Single Phase Two MPPT Trackers HNS3000TL HNS3600TL HNS4000TL HNS5000TL Please keep this manual all the time available in case of emergency About This Manual 01 The typical connection diagram for the entire PV system is on grid CircuitBreaker 1 SurgeProtective Device DCA1 DCA1 PE WIFI RS485 Cloud server Portal web...

Страница 4: ...tection system refer to the following options AC side nominal discharge current 20KA second grade lightning protection protection voltage 2 5KV DC side nominal discharge current 20KA second grade lightning protection protection voltage 3 2KV The wiring distance between the inverter and the distribution box should be at least 5 meters Utility Referred to as grid in this manual i e the media your el...

Страница 5: ...ase read and follow all the instructions and cautions during installation operation and maintenance Safety Symbols 03 2 2 Explanations of Symbols Do not dispose of this device with the normal domestic waste Without Transformer This inverter does not use transformer for the isolation function CE mark The inverter complies with the requirements of the applicable CE guidelines Refer to manual before ...

Страница 6: ...nts Package List Open the package please check the packing list shown as below Installation 04 No 1 2 3 4 5 6 7 1 1 1 1 1 1 1 Solar inverter User manual Certificate of inspection Installation diagram Warranty card Wall mounting bracket GPRS Wi Fi Monitoring Module 8 9 10 11 12 13 1 3 3 1 1 1 set AC connector Plastic Expansion Tube Tapping screw Security screw Screwdriver for security screw DC plug...

Страница 7: ...on Installation diagram Warranty card Notice for installation Wall mounting bracket RV5 5 6 terminal 9 10 11 12 13 14 15 16 3 3 1 1 1 2sets 4 1 4 Plastic Expansion Tube Tapping screw Security screw Screwdriver for security screw DC plug connector Screw Waterproof Junction Box Terminal Qty Items No Qty Items 14 User Manual Certificate of inspection Installation diagram Warranty card 15 Notice For I...

Страница 8: ...NS3600TL 1 Single Phase Two MPPT Trackers HNS3000TL HNS3600TL HNS4000TL HNS5000TL Overview of the Connection Area The following figures show the assignment of the individual connection areas on the bottom of the inverter Installation 06 3 2 Product Overview 278mm 261mm 118mm 170mm 345mm 460mm ...

Страница 9: ... optional DC connectors for the PV strings DC connectors for the PV strings AC connection Communication port RJ 45 Port DRM Items 1 2 6 3 4 5 Single Phase One MPPT Tracker Single Phase Two MPPT Trackers 3 RJ 45 port WIFI 4 5 1 2 6 RJ 45 port ...

Страница 10: ... flammable or corrosion materials where is suitable for inverter s weight and dimensions The ambient temperature should be within 25 60 between 13 F and 140 F The installation of inverter should be protected under shelter from direct sunlight or bad weather like rain snow lightning etc Installation 08 3 3 Mounting Location The inverter should be installed vertically on the wall or lean back on pla...

Страница 11: ...nverter Leave the enough space around inverter easy for accessing to the inverter connection points and maintenance 300mm 100mm 100mm 500mm Step 1 242mm 36mm 36mm Single Phase One MPPT Tracker Single Phase Two MPPT Trackers 328 5mm 26mm 26mm 35mm ...

Страница 12: ...the inverter The open circuit voltage and short circuit current of PV string must not exceed inverter s range The isolation resistance between PV string and ground must exceed 10 kΩ The polarity from PV strings are correct Use the DC plugs in the accessory The lightning protector should be equipped between PV strings and inverter Disconnect all of the PV DC switch during wiring 3 5 1 PV Connection...

Страница 13: ...ease make sure the correct polarity of the cable connected with inverter otherwise inverter could be damaged Note Please use PV connector crimper Step 2 Positive Crimp Contact Negative Crimp Contact to pinch the point of the arrow 12 15mm 12 15mm Step 1 Note PV cable suggestion 2 2 Cross section Cable Diameter 4 mm 4 mm ...

Страница 14: ...g AC cable to the inverter The AC grid voltage must not exceed inverter s range The phase line from AC distribution box are correctly connected Use the AC plugs in the accessory The surge protector should be equipped between grid and inverter Disconnect the AC grid switch during wiring Installation 12 3 5 2 Grid Connection MC STOP MC MC STOP MC Note You ll hear click sound when the connector assem...

Страница 15: ...ase comply with electric safety when connecting Please make sure the right line of AC grid connected with inverter otherwise inverter could be damaged AC line goes through AC terminal waterproof head and cap Step 1 Step 2 Note AC cable suggestion 7mm 2 Cross section 4 mm ...

Страница 16: ...e L Neutral line N and Ground Wire PE according to polarity Step 3 Connect AC terminals and waterproof head tighten the cap make sure they clip closely together Connect AC connector to AC terminal of the inverter Ensure firm insertion Step 4 ...

Страница 17: ...5 connector Pins are defined as follow Connect AC connection and turn on AC breaker wait till the LED indicators on Wi Fi module flashing Configure the communication bar router account registration etc See the WIFI connection manual for details Install the communication stick to the inverter 3 5 3 Communication Connection 1 2 3 4 5 6 7 8 PIN Assignment DRM5 DRM6 DRM7 DRM8 RefGen COM DRM0 RJ45 sock...

Страница 18: ...n 5 6 FAULT LED Indicator COM LED Indicator ENT Touch Button POWER LED Indicator The HNS series inverter is equipped with an earth fault alarm When earth fault occurs the fault indicator at the front LED screen will light up And the buzzer of the inverter will keep ringing until the fault is resolved This function is only available in Australia and New Zealand Earth Fault Alarm ...

Страница 19: ...Country XX Case_Temp XXX ModleTemp XXX ScreenTemp XXX Rated Power XX KW PGaImp XXX NGaImp XXX PGbImp XXX NGbImp XXX SET Pass World ClearRecord Nub Total X XXX Err XXXXX StartTime XXXXX LastTime XXXXX Vac Max XXX V Vac Min XXX V Fac Max XXX Hz Fac Min XXX Hz Safety XXX ...

Страница 20: ...u Date Time SET Date Dd Mm 2015 Time Hh Mm Ss RS485 Address Address xxxxx Baud rate xxxx Active Island ON OFF GridPowerCtrl SN XX DSP XXX Wifi Info SN XX IP XXX SN number SN XX DSP XXX HMI XXX PQ Mode Power Factor KVAr PQD ...

Страница 21: ...P and HMI vision Set the output power limited value this function can t use view WIFI SN and IP address default address is 1 more 2 3 Error record Set Clear record Date and time set SN number WIFI info Only RD test customer can t use it Active island set power factor and PQP power generation control unit on and off PQ mode Grid power ctrl RS485 Address UP DOWN Switch countries UP DOWN Adjust the t...

Страница 22: ... Enter Enter Enter Enter Enter Input Password Para Adj Para XXX Power Off and Restart Inverter Finish Para View Max VoLtage XXX Min VoLtage XXX Max FrEquency XXX Min FrEquency XXX Safety XXX Note Change all parameters that need to be modified before restarting the inverter ...

Страница 23: ...ting has been finished accordingly to local standards or regulations Commissioning Procedures Turn on the AC switch between inverter grid output and the public grid Turn on the DC switch on the inverter Turn on the PV switch of the system 5 Commissioning Sign Color Instructions POWER Green Green Red FAULT On Power On On Normal Operation and feed into the utility grid Flash Check wiring COM DOWN EN...

Страница 24: ... off the DC switch on the inverter Turn off the PV switch of the system Turn off the AC switch between inverter grid output and the public grid Follow the procedures below when the inverter needs to be restarted Follow the Shut Down Procedures of Article 6 to shut down inverter Follow the Commissioning Procedures of Article 5 to turn on the inverter 7 Maintenance Trouble Shooting 6 Shut Down Resta...

Страница 25: ...em 7 2 Fault Code and Trouble Shooting DOWN ENT UP ESC POWER FAULT COM FAULT Red LED Green LED Green LED POWER COM LED Display Description Suggestion FAULT POWER COM Light off Light off Light Light Light Control system is activated Working normally Low DC side voltage Terminated due to failure Need troubleshooting No power generation System waiting ...

Страница 26: ...re down to the normal Or install the inverter at a well ventilated site replace the temperature sensor PV Over Fault PV input voltage high PV array s Voc high re design the PV array configuration measure the PV array voltage is the same as inverter displayed M Grid Volt Fault Grid voltage out of range grid voltage out of the setting range grid back to the normal the inverter will restart automatic...

Страница 27: ...1 278 x 261 x 118 395 x 345 x 170 IP65 Aluminum 25 60 Transformerless 0 100 EN IEC 61000 6 2 EN IEC 61000 6 3 EN61000 3 2 EN61000 3 3 EN61000 3 11 EN61000 3 12 EN IEC 62109 1 2 UL1547 IEC 60068 2 EN50549 1 EN50438 RD 1699 UNE 217001 RD 413 IEC61727 IEC62116 IEC61683 VDE4105 UL1741 VDE0126 AS4777 2 NB T 32004 2013 UNT C 15 712 1 ABNT NBR 16149 ABNT NBR 16150 Integrated DC switch Dimensions W x H x ...

Страница 28: ...nsulation Resistance Detection AC Short Circuit Protection AC Over Current Protection AC Over Voltage Protection Anti Islanding Protection Residual Current Detection Over Temperature Protection Integrated DC switch Surge Protection DC AC Dimensions W x H x D mm Weight kg Protection Degree Enclosure Material Ambient Temperature Range Humidity Range Topology Communication Interface Cooling Concept N...