Commissioning
21
Before starting up commissioning at site, please make sure below procedures
and requirements are fully meet.
· Mounting location is meet the requirements.
· All of the electrical wiring is firmly connected, including PV wiring, Grid wiring
and Earth wiring.
· The inverter setting has been finished accordingly to local standards or
regulations.
Commissioning Procedures
· Turn on the AC switch between inverter grid output and the public grid;
· Turn on the DC switch on the inverter;
· Turn on the PV switch of the system.
5.Commissioning
Sign
Color
Instructions
POWER
Green
Green
Red
FAULT
On : Power On
On: Normal Operation and feed into the utility grid
Flash: Check wiring
COM
DOWN
ENT
UP
ESC
POWER
FAULT
COM
FAULT
Red LED
Green LED
Green LED
POWER
COM
LED Indication