Installation and Setup 29
4510012 - REV F – 220621
Installation and Setup
General Setup Considerations
In addition to providing proper space for the STC-WSN-GEN-S Steam Heat Shrink Tunnel, and
ensuring that it will be in the desired section within the assembly line chain, consider other
factors, including:
Material Handling
The most critical factor for consistently achieving superior quality heat shrinking is product
handling. Adequate Conveyor Product Guides must be provided, correctly installed, and
properly maintained, so that the products consistently pass through in such a way as to be
evenly heated, and unpredictable movements are minimized. Incorrect or inconsistent
product handling my cause uneven shrinking, maintenance problems, and could lead to
equipment damage. The customer is responsible for maintaining proper material handling
equipment.
Conveyor
Conveyor Product
Guides
Bottles
Product Guides on Conveyor
Содержание STC-WSN300-2M
Страница 1: ...WSN GEN S Steam Heat Shrink Tunnel User Guide ...
Страница 2: ...2 Abbreviations 4510012 REV F 220621 ...
Страница 8: ...8 Abbreviations 4510012 REV F 220621 ...
Страница 28: ...28 Introduction 4510012 REV F 220621 STC WSN600 2M GEN S Top View Front View Exit View Entry View ...
Страница 66: ...66 Troubleshooting 4510012 REV F 220621 ...
Страница 67: ...Electrical Schematics 67 4510012 REV F 220621 Electrical Schematics Complete System WSN GEN S ...
Страница 68: ...68 Electrical Schematics 4510012 REV F 220621 Boiler ...
Страница 72: ...72 Parts List 4510012 REV F 220621 Exploded Diagrams Stand Drawing Number YS130EX2 01 ...
Страница 74: ...74 Parts List 4510012 REV F 220621 Tunnel Drawing Number YS130EX2 02 ...
Страница 78: ...78 Parts List 4510012 REV F 220621 Boiler ...
Страница 79: ...Parts List 79 4510012 REV F 220621 Inside Boiler Electrical Cabinet ...
Страница 84: ...84 Technical Support 4510012 REV F 220621 ...