Safety Checklist :

Safety Checklist :

Air speed and resultant action to be taken

Mobile towers - 3T Method Checklist

Beufort Scale

0

1 mph

12 mph

17 mph

25 mph

40 mph

Calm, smoke rises easily upwards

No action needed

Cease work

No action needed, keep a watch

If expected, dismantle the tower

If expected, tie tower to a rigid

structure

Moderate breeze, raises dust

Gale force, cannot even walk

Raises loose papers, leaves and small 

twigs move
Strong breeze, tree branches bend, unable 

to use umbrella

3

4

5

6

Description

Air Speed

Action to be taken

Ensure all brace claws operate and lock correctly prior to erection

Inspect components prior to use

Tower upright and level

Castors locked and legs correctly adjusted

Diagonal braces fitted

Stabilizers/outriggers fitted as specified

Platforms located and wind-locks on

Toe boards located

Check that the guardrails are fitted correctly

Содержание MACL 320

Страница 1: ...Assembly Manual Cantilever Towers MACL Series BS1139 6 2014 No CE 21 22 046...

Страница 2: ...anufactured in our ISO 9001 accredited facility This user guide provides you with step by step instructions to ensure your system is assembled easily and safely using the 3T Through the Trapdoor metho...

Страница 3: ...ve been designed in accordance with BS1139 6 2014 The Affix MACL Series Mobile Tower are versatile and user friendly aerial solution for all access needs It gives a work platform for use by a maximum...

Страница 4: ...g electric cables No personnel or material to be on the platform whilst the tower is being moved Damaged components or components from other tower systems must never be used Stabilizers should always...

Страница 5: ...oderate breeze raises dust Gale force cannot even walk Raises loose papers leaves and small twigs move Strong breeze tree branches bend unable to use umbrella 3 4 5 6 Description Air Speed Action to b...

Страница 6: ...heck the locking triggers in the bracing hooks such that they are working properly Lock the castor by moving the brake lever fully down Sort the braces into horizontal and diagonal braces the diagonal...

Страница 7: ...ring this step Insert the castor wheels with the jack pipe inside the bottom of the tubes of the 1st level 2 rungs Ladder Frame and Span frame DO NOT USE Hammer DO NOT USE Hammer Hook both the bottom...

Страница 8: ...on Page 18 Step 3 1 Step 3 1 Step 3 2 Step 3 2 One person should hold the frame in upright position during this step Step 4 1 Step 4 1 Hook the Diagonal Brace to the 1st Rung of the 1st level 2 rungs...

Страница 9: ...level 4 rungs Span Frame at one end and the other end should be hooked to the 1st Rung of the 2nd level 4 rungs Ladder Frame on the other side Step 5 2 Step 5 2 Hook the 2nd Diagonal Brace to the 1st...

Страница 10: ...er pair of Horizontal Braces to the 4th Rung of both the 2nd level frames Using the 3T method standing on the ladder and leaning back against the edge of the trapdoor aperture fit the horizontal brace...

Страница 11: ...Diagonal Brace to the 3rd Rung of the 2nd level 4 rungs Span Frame at one end and the other end should be hooked to the 1st Rung of the 3rd level 4 rungs Ladder Frame on the other side Step 10 2 Step...

Страница 12: ...of the 3rd level 4 rungs Walk through Frame at one end and the other end should be hooked to the 3rd Rung of the 3rd level 4 rungs Ladder Frame on the other side Step 12 1 Step 12 1 Hook the working...

Страница 13: ...tal Braces to the 4th Rung of both the frames of 3rd level on both the sides Step 14 1 Step 14 1 Clamp the 4 plastic toe board holders on all the 4 corners of the working platform level around the wor...

Страница 14: ...s with the jack pipe inside the bottom of the tubes of the 2 rungs Counterweight Span Frame which is actually the standard 1 Mtr Span frame DO NOT USE Hammer Hook both the Counterweight Platforms side...

Страница 15: ...e 2nd Rung of the 2 rungs Counterweight Frame and the other end to the 2nd Rung of the 2nd level 4 rungs Ladder Frame of the main tower 14 ASSEMBLY Step 18 Step 17 Hook the 2 Horizontal braces to the...

Страница 16: ...amp the 2 Cantilever frames flushing the top of the frames with the top spigots of the main tower Place the Steel Ballast Counterweight as per the Components Table on Page 23 Step 19 ASSEMBLY 15 Step...

Страница 17: ...MBLY Step 21 Step 22 Hook both the Cantilever Platforms side by side to the 1st Rung of the 5 rungs Cantilever frames Hook the 2 Horizontal braces to the 4th and the 5th Rung of the 5 rungs Cantilever...

Страница 18: ...l the 4 corners of the cantilever working platform level around the cantilever working platform For more details refer to Toe board Assembly Details on Page 18 Step 23 2 Step 23 2 Insert the wooden to...

Страница 19: ...ert the Side Toeboard and the End Toeboard in the respective toeboard slots as shown in the figure Clamping Instructions Always ensure the Spring Clips are in the lock position after inserting the upp...

Страница 20: ...ame BD200 250 BH200 250 Diagonal Brace Horizontal Brace PF200 250 Fixed Platform PT200 250 Trapdoor Platform ST200 300 450 600 Stabilizer BT200 250 ToeBoard Set FL10135 Ladder Frame FL20135 Ladder Fra...

Страница 21: ...20 COMPONENTS AFC BD BH AFC FC130 CFW20135 AFC BW AFC PF...

Страница 22: ...Fig 01 Fig 01 Position the stabilizers so that the footpads are approximately equidistant from each other Adjust the stabilizers and reposition the clamps as required to make firm contact with the gr...

Страница 23: ...ositioned prepare the tower for use Check that the tower is vertical Reapply the castor brakes Check and adjust as necessary to ensure all castors and stabilizers are in firm contact with the ground C...

Страница 24: ...3 7 3 4 3 1 0 0 2 4 4 296 325 5 3 3 3 198 219 200 240 2 1 1 0 0 2 4 4 4 3 4 3 2 3 169 177 190 230 3 3 6 3 4 3 2 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 14 12 0 4 0 3 14...

Страница 25: ...24 BS1139 6 2014 Certification by TUV India...

Страница 26: ...ps www facebook com affixscaffoldin https www linkedin com company affix scaffolding llc https www linkedin com company affix scaffolding llc Website SCAN ME PO Box No 201633 Doha Qatar Tel 974 4416 1...

Отзывы: