WARNING

NEVER FORGET TO LOCK THE 

CASTOR WHEELS

DESCRIPTION:

Through The Trapdoor (3T) Method:

The 3T method of construction is an approved method of assembly and it minimizes the risk of 

a fall from height. The erector can complete an ‘assembly or access’ platform level from which 

the ‘next lift’ of frames, braces and platform is added, until the final working height of the tower 

is achieved. By following the 3T method, the erector sits through the hatch of the platform with 

their feet resting on the frame rungs. In this position the erector can attach the guardrail braces. 

Once guard-rails are secured in position the erector can climb onto the platform and continue 

constructing the next level.

Compliances:

The Affix MACL Mobile Tower structure and its components have been designed in accordance 

with BS1139-6: 2014.

The Affix MACL Series Mobile Tower are versatile and user-friendly aerial solution for all access 

needs. It gives a work platform for use by a maximum of two people, with weight evenly 

distributed across the platform. The tower can be easily erected and with highly customizable 

assembly it meets almost all the site constraints and provides safe and efficient working 

platform. The key safety feature is the smart locking claws provided for the horizontal and 

diagonal bracings. It allows an instant lock-up performed by single hand use, however, with the 

reverse unlocking plug, two hands are needed to unplug the bracing.

The information and instructions included in this manual are provided to help get the best 

possible service from your MACL Series Mobile Tower. This user guide provides you with step by 

step instructions to ensure your system is assembled easily and safely, using the 3T (Through 

the Trapdoor) method.

Содержание MACL 320

Страница 1: ...Assembly Manual Cantilever Towers MACL Series BS1139 6 2014 No CE 21 22 046...

Страница 2: ...anufactured in our ISO 9001 accredited facility This user guide provides you with step by step instructions to ensure your system is assembled easily and safely using the 3T Through the Trapdoor metho...

Страница 3: ...ve been designed in accordance with BS1139 6 2014 The Affix MACL Series Mobile Tower are versatile and user friendly aerial solution for all access needs It gives a work platform for use by a maximum...

Страница 4: ...g electric cables No personnel or material to be on the platform whilst the tower is being moved Damaged components or components from other tower systems must never be used Stabilizers should always...

Страница 5: ...oderate breeze raises dust Gale force cannot even walk Raises loose papers leaves and small twigs move Strong breeze tree branches bend unable to use umbrella 3 4 5 6 Description Air Speed Action to b...

Страница 6: ...heck the locking triggers in the bracing hooks such that they are working properly Lock the castor by moving the brake lever fully down Sort the braces into horizontal and diagonal braces the diagonal...

Страница 7: ...ring this step Insert the castor wheels with the jack pipe inside the bottom of the tubes of the 1st level 2 rungs Ladder Frame and Span frame DO NOT USE Hammer DO NOT USE Hammer Hook both the bottom...

Страница 8: ...on Page 18 Step 3 1 Step 3 1 Step 3 2 Step 3 2 One person should hold the frame in upright position during this step Step 4 1 Step 4 1 Hook the Diagonal Brace to the 1st Rung of the 1st level 2 rungs...

Страница 9: ...level 4 rungs Span Frame at one end and the other end should be hooked to the 1st Rung of the 2nd level 4 rungs Ladder Frame on the other side Step 5 2 Step 5 2 Hook the 2nd Diagonal Brace to the 1st...

Страница 10: ...er pair of Horizontal Braces to the 4th Rung of both the 2nd level frames Using the 3T method standing on the ladder and leaning back against the edge of the trapdoor aperture fit the horizontal brace...

Страница 11: ...Diagonal Brace to the 3rd Rung of the 2nd level 4 rungs Span Frame at one end and the other end should be hooked to the 1st Rung of the 3rd level 4 rungs Ladder Frame on the other side Step 10 2 Step...

Страница 12: ...of the 3rd level 4 rungs Walk through Frame at one end and the other end should be hooked to the 3rd Rung of the 3rd level 4 rungs Ladder Frame on the other side Step 12 1 Step 12 1 Hook the working...

Страница 13: ...tal Braces to the 4th Rung of both the frames of 3rd level on both the sides Step 14 1 Step 14 1 Clamp the 4 plastic toe board holders on all the 4 corners of the working platform level around the wor...

Страница 14: ...s with the jack pipe inside the bottom of the tubes of the 2 rungs Counterweight Span Frame which is actually the standard 1 Mtr Span frame DO NOT USE Hammer Hook both the Counterweight Platforms side...

Страница 15: ...e 2nd Rung of the 2 rungs Counterweight Frame and the other end to the 2nd Rung of the 2nd level 4 rungs Ladder Frame of the main tower 14 ASSEMBLY Step 18 Step 17 Hook the 2 Horizontal braces to the...

Страница 16: ...amp the 2 Cantilever frames flushing the top of the frames with the top spigots of the main tower Place the Steel Ballast Counterweight as per the Components Table on Page 23 Step 19 ASSEMBLY 15 Step...

Страница 17: ...MBLY Step 21 Step 22 Hook both the Cantilever Platforms side by side to the 1st Rung of the 5 rungs Cantilever frames Hook the 2 Horizontal braces to the 4th and the 5th Rung of the 5 rungs Cantilever...

Страница 18: ...l the 4 corners of the cantilever working platform level around the cantilever working platform For more details refer to Toe board Assembly Details on Page 18 Step 23 2 Step 23 2 Insert the wooden to...

Страница 19: ...ert the Side Toeboard and the End Toeboard in the respective toeboard slots as shown in the figure Clamping Instructions Always ensure the Spring Clips are in the lock position after inserting the upp...

Страница 20: ...ame BD200 250 BH200 250 Diagonal Brace Horizontal Brace PF200 250 Fixed Platform PT200 250 Trapdoor Platform ST200 300 450 600 Stabilizer BT200 250 ToeBoard Set FL10135 Ladder Frame FL20135 Ladder Fra...

Страница 21: ...20 COMPONENTS AFC BD BH AFC FC130 CFW20135 AFC BW AFC PF...

Страница 22: ...Fig 01 Fig 01 Position the stabilizers so that the footpads are approximately equidistant from each other Adjust the stabilizers and reposition the clamps as required to make firm contact with the gr...

Страница 23: ...ositioned prepare the tower for use Check that the tower is vertical Reapply the castor brakes Check and adjust as necessary to ensure all castors and stabilizers are in firm contact with the ground C...

Страница 24: ...3 7 3 4 3 1 0 0 2 4 4 296 325 5 3 3 3 198 219 200 240 2 1 1 0 0 2 4 4 4 3 4 3 2 3 169 177 190 230 3 3 6 3 4 3 2 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 14 12 0 4 0 3 14...

Страница 25: ...24 BS1139 6 2014 Certification by TUV India...

Страница 26: ...ps www facebook com affixscaffoldin https www linkedin com company affix scaffolding llc https www linkedin com company affix scaffolding llc Website SCAN ME PO Box No 201633 Doha Qatar Tel 974 4416 1...

Отзывы: