ADDITIONAL INSTALLATION NOTES
• A cable duct is required with no sharp bends
• Tank water should never exceed by more than 300mm past the backfill concrete level
• The inlet(s) and cable duct(s) are to be cut on site to your own specifications, and should be
properly sealed with rubber grommets
• It is most important that once the tank is in situ with all the inlet connections made, the drainage
system should be flushed out, and all sand, debris etc. removed from the chamber
• If vehicular traffic will be passing over the chamber, it is ESSENTIAL that the cover slab is
constructed so that there is NO DIRECT LOAD on the chamber, an access cover with the correct
specified S.M.W.L. must be used
WE RECOMMEND THAT ONCE THE SYSTEM HAS BEEN COMPLETELY
INSTALLED, OUR ENGINEER ATTENDS THE SITE TO COMMISSION THE
SYSTEM
By beginning installation of the unit the installer is deemed to have read and complied with
the above. Failure to do so will invalidate your warranty. If you have any questions please
contact us.