PUMP CHAMBER INSTALLATION GUIDELINES

 

 

(United Kingdom Health & Safety at Work Act 1974)

 

DO NOT BEGIN INSTALLATION OF THIS CHAMBER UNTIL YOU HAVE READ AND 

 

FULLY UNDERSTOOD THE REQUIREMENTS BELOW. 

THE CONCRETE BACKFILL SHOULD BE DESIGNED TO PROTECT THE CHAMBER FROM ALL  
EXTERNAL GROUND AND GROUND WATER PRESSURE. THEREFORE IT SHOULD BE  
WATERTIGHT.  

ANY GROUNDWATER ALLOWED TO LEAK BETWEEN THE CONCRETE BACKFILL AND THE  
PUMP CHAMBER IS LIKELY TO CAUSE A BUILD UP OF PRESSURE WHICH WILL DAMAGE THE  
CHAMBER.  

WE CANNOT ACCEPT RESPONSIBILITY FOR DAMAGE OR DEFORMATION OF THE CHAMBER  
OR PIPEWORK CAUSED BY EXTERNAL GROUND, GROUNDWATER PRESSURE OR GROUND  
MOVEMENT DURING OR AFTER INSTALLATION.  

DO NOT COMMENCE WITH INSTALLATION IF YOU CANNOT CONTROL ANY GROUNDWATER 
PRESENT IN ORDER TO PROVIDE A DRY EXCAVATION. 

IF NECESSARY LINE THE ENTIRE EXCAVATION WITH  A CONTINUOUS LAYER OF PLASTIC  
SHEETING PRIOR TO INSTALLATION.

As with all site work the dangers of working with water and electricity pose severe threats to health 
if obvious and fundamental precautions are not taken. Therefore if you are in any doubt to any of the 
following, please do not hesitate to contact us. 

All site work should be undertaken by qualified personnel only. 

Lifting & Storage 

Tank delivery is direct to site via a courier, any pumps, alarm panels and internal pipework will be  

secured within the tank, please check the contents and notify us within 48 hours of any shortages.

 

Great care should be taken when lifting and handling the chamber and suitable equipment should be 
used at all times. 

The nature of the design means the centre of gravity of the chamber is likely to be offset. 

Any storage site should be free of any object which may cause damage to the chamber, and the  
chamber should be secured to prevent any rolling. 

WE CANNOT ACCEPT RESPONSIBILITY FOR ONSITE DAMAGE

© Automated Environmental Systems Ltd. February 2022

Содержание MINI FOUL

Страница 1: ...E GUIDELINES Automated Environmental Systems Ltd Unit 1 1 Wimbledon Avenue Brandon Suffolk IP27 0NZ 01842 819130 service automatedenvironmentalsystems co uk MINI FOUL Pumping Station Automated Environ...

Страница 2: ...PUMPING STATION IS DESIGNED TO HANDLE EFFLUENT The following items must be kept out of the pump chamber Baby Wipes Nappies Cleaning Wipes Sanitary Towels THESE TYPES OF PRODUCTS ARE LIKELY TO BLOCK TH...

Страница 3: ...the technologies applied to the equipment supplied Whilst every care has been taken during the compilation of this manual to ensure that the information provided is correct no liability can be accepte...

Страница 4: ...Confined Space Entry certification should enter a pump chamber and then only if there is a second qualified person equipped with required safety equipment supervising The following checklist although...

Страница 5: ...re is relieved DANGER HIGH VOLTAGE Control boxes contain high voltage live wiring and terminals Entry of control boxes is not permitted except by qualified electrical personnel only ensure controller...

Страница 6: ...A CONTINUOUS LAYER OF PLASTIC SHEETING PRIOR TO INSTALLATION As with all site work the dangers of working with water and electricity pose severe threats to health if obvious and fundamental precautio...

Страница 7: ...order to be protected from any external force the chamber should be completely surrounded by concrete The concrete surrounding the chamber should be of suitable thickness usually a minimum of 150mm a...

Страница 8: ...uld concrete be poured directly onto the chamber Attempting to pour too much concrete at once will result in the chamber floating or particularly above the halfway point damage to the chamber due to e...

Страница 9: ...l sand debris etc removed from the chamber If vehicular traffic will be passing over the chamber it is ESSENTIAL that the cover slab is constructed so that there is NO DIRECT LOAD on the chamber an ac...

Страница 10: ...getting no flow it is most likely due to an airlock in the pipe To ensure that the tank isn t emptied too much and air is sucked up reduce the length of the float cable through the side clip to have t...

Страница 11: ...les are to be connected using only two of the cable cores the colour coding can be found inside the instructions manual provided with the float s The core that isn t used should be cut off and isolate...

Страница 12: ...hole of the tank 2 The pump is to be situated at the bottom of the tank attached to the flexible hose using the hose tail bend and clips provided excess hose should be removed as required on site 3 T...

Страница 13: ...the pump is checked every six to twelve months to ensure that the oil chamber is free from contamination as per the manufacturer s instructions and to check the pump for any blockages and to clean aw...

Страница 14: ...or cloth Plastic objects Sand rock stones or other debris Failure to follow these guidelines may invalidate your warranty in which case any service visits and replacement pumps parts as a result of m...

Отзывы: