background image

Valve Programming  

Press   

   and hold for 3 seconds to unlock the valve for programing. 

FIRST - UNLOCK VALVE 

Содержание HF 500

Страница 1: ...Operation Manual HF 500 IRON HYDROGEN SULFIDE MANGANESE FILTER...

Страница 2: ...o not subject unit to freezing conditions All plumbing must be in compliance with local and state plumbing codes Determine a suitable location for the system The chosen location should provide you ade...

Страница 3: ...Shut off main o Release water pressure o Make pipe connections Level I valve programming Initial settings o Current Time o Current Date Level II programming settings made at factory Drain line connect...

Страница 4: ...n 3 Make final main water connections to the valve using quick connect fittings Optional supplied fittings 2 3 4 male threaded 90 quick connect fitting 2 1 male threaded straight quick connect fitting...

Страница 5: ...connect pipe fittings Metered for demand regeneration Ideal for softeners iron sulfur carbon and sediment filters For tanks to 16 softeners For tanks to 10 filters Easy to program Operational data sho...

Страница 6: ...Valve Programming Press and hold for 3 seconds to unlock the valve for programing FIRST UNLOCK VALVE...

Страница 7: ...ttings Valve button programing control definitions 2 Set Save Regen Key Press this key to select a program or to save a setting 3 Up arrow Key Press these keys to go to the previous menu 4 Down arrow...

Страница 8: ...time of valve set up Date Enter today s date at time of valve set up Number of People Enter of full time residence default 4 Water Hardness Enter grains of hardness default 20 Vacation Mode Default is...

Страница 9: ...and move to hour spot not flashing 9 Press to go to current date set up or to cycle through level I settings continue to set all level I setting 10 Press to exit menu and return to main screen Making...

Страница 10: ...ramming Settings have been pre set at the factory These settings have been made at the factory and are held in memory Level II settings will not be lost during a power outage However if adjustments ar...

Страница 11: ...or to move to another menu 9 Press to exit menu and return to main screen Making Adjustments Level II All programing is adjusted using the same methods as for Level I programming Setting level II pro...

Страница 12: ...w installation Valve is programmed for SOFTENER operation YELLOW injector is installed Regeneration is set using CALANDAR CLOCK Regeneration is set for 11 00 PM may be adjusted Capacity calculation is...

Страница 13: ...ORTANT Proper backwash is critical for Iron Sulfur filters Therefore do not tee off drain line or use drain tubing longer than 20 Use or 1 drain line for longer runs CAUTION Inspect valve for brine pl...

Страница 14: ...pass valves to the OFF position red valves pointing across the valve as shown With the faucet still on open the main water supply valve IN Off Position CAUTION Inspect all plumbing connections Check f...

Страница 15: ...edit mode flashing 3 Press or to select immediate flashing 4 Press to save 5 Press to show Advancing to Backwash Note Valve will reset backwash cycle to delay after manual regen cycle has finished Not...

Страница 16: ...You will need to run Backwash cycle until drain line runs clear NOTE When advancing to another cycle valve will show advancing to Once the valve is in a subsequent cycle you may press any button to a...

Страница 17: ...er is flowing from the drain line If the mineral tank was not filled do so at this time following the directions below CAUTION Allow time for glued connections to cure before proceeding CAUTION Inspec...

Страница 18: ...after unit has finished the first cycle NOTE It s common to run multiple backwash cycles with carbon and Iron filters due to the amount of fines in the media System Installation Leave the system in b...

Страница 19: ...Ready for Service 1 Slowly open outlet to supply water to the house 2 Open faucet in the house to remove debris and air to flush system...

Страница 20: ...system is to be installed outside exposed to the weather and or UV Rays it is necessary to install a weather cover over the valve The weather cover will protect the valve from the damaging effects of...

Отзывы: