Aerosmith GT38LI Скачать руководство пользователя страница 2

AEROSMITH CONCRETE GAS TOOL OPERATIONAL MANUAL

2

the battery.

   2. To install the battery, insert the battery 

cartridge until hearing a “click”.

   3. To remove the battery, grip the buttons on 

both side of battery cartridge and pull out.

C. Battery Light Indicator

LED

Battery Level

All LEDs

100%

1 Green and 1 Red 

LED

50%

1 Red LED

25%

NOTE:

• 

After using the tool, remove the battery from 

the tool to prevent the tool from being fi red.

D. Preparing the fuel cell

Caution !

• 

Never attempt to use fuel cell from other 

manufacturer.

• 

Do not remove the cap when it is unused.

• 

Never drill a hole on the fuel cell.

• 

Do not inhale the gas. Breathing in the gas 

could cause sleepiness, dizziness or nausea.

• 

The fuel cell is not refi llable, do not attempt 

to refi ll the gas.

Steps:

First ensure to use the corect colour valve, Please 

refer to the technical specifi cations.

   1. Detach the cap, attach the valve by pushing 

A. Charging

Steps:

   1. Plug the battery charger into the proper AC 

voltage source, green light will be flashing.

   2. Insert the battery into charger, red light will 

alight indicating the battery is charging.

   3. It takes about 60 minutes for charging. 

   4. When fully charged, green light will remain 

alight.

   5. After charging, unplug the charger from the 

power source.

• 

If orange light is blinking, remove the battery 

cartridge and plug again.

• 

If this happens continuously, the battery 

cartridge or charger may be damaged. 

Consult authorized serviceman for 

replacement of new battery cartridge.

NOTE:

• 

Never attempt to open the charger or battery 

cartridge.

• 

The battery charger is for charging specifi c 

battery pack. Never attempt to charge battery 

pack from other manufacturer’s battery 

cartridge. Unsuitable battery cartridges may 

cause fi re that causes injury.

• 

When the battery charger is being used, 

keep out of direct sunlight.

• 

To get better cooling effect, keep the exhaust 

area clean.

B. Installing and removing the battery

Steps:

   1. Empty fasteners from the magazine and 

make sure the trigger is not pulled while installing 

1 - OPERATIONS

Содержание GT38LI

Страница 1: ...OPERATIONAL MANUAL GT38LI CONCRETE GAS TOOL...

Страница 2: ...Plug the battery charger into the proper AC voltage source green light will be flashing 2 Insert the battery into charger red light will alight indicating the battery is charging 3 It takes about 60...

Страница 3: ...at the bottom 2 Load the pins into the slit in the rear of the magazine until they reach the top of pin stopper 3 Further pull the follower holder press the button on the pin carrier and release it ge...

Страница 4: ...in guide by bare hand or by any parts of the body Never point the tools at anybody Only pull the pin guide to separate the pin lock Steps 1 Remove the pins fuel cell and battery attached on the tool 2...

Страница 5: ...tal reuse or connection to power source SYMPTOM 2 Red LED on charger is blinking Possible reasons Services Battery is hot Remove battery from charger and allow to cool Inspect battery charger and cart...

Страница 6: ...Contact authorized ser viceman for repair Some dirt on the valve washer inside cylinder Contact authorized ser viceman for repair Valve wave washers lose elasticity Contact authorized ser viceman for...

Страница 7: ...are dirty Contact authorized ser viceman for repair SYMPTOM 4 Unstable performance Possible reasons Services Built up dirt and debris inside cylinder Contact authorized ser viceman for repair SYMPTOM...

Страница 8: ...y is assumed for direct or consequential damages resulting from the improper use of the tool The national safety and occupational safety regulations and the safety precautions given in this operating...

Отзывы: