2.1.11. Position the sail mount tang of the nose part of the sail under the nose plate over the
bolt and secure the assembly with the self-locking nut (Fig. 9). Screw the self-locking nut full
tight and than unscrew it 180 deg. back. Make sure that the sail mount tang moves around the
bolt freely. Living a little slack in the joint will provide the leading edge for necessary movement
in the bottom nose plate slot.
Fig. 9
2.1.12. Release the sweep wires from the hook on the keel tube to loose a sail tension.
2.1.13. The further set up procedure is similar to the one from a 6-meter long package (Section
2.2, except points 2.2.1-2.2.4).
2.2. SET UP PROCEDURE FROM THE PACKAGE 6 METRES LONG
2.2.1. With the wing in the bag (6 meters long) lay the wing on the ground zipper up (Fig.10).
Fig. 10
2.2.2. Undo the zipper. Remove battens and the base tube from the bag.
2.2.3. Untie the velcro straps.
2.2.4. Turn the glider so that the downtubes packed into the safety bags are on bottom and
kingpost is on top (Fig. 11).
9
Содержание Still 17
Страница 3: ...2 ...
Страница 7: ...b Fig 3 4 ...
Страница 25: ...23 LOG BOOK TABLE OF FLIGHT HOURS DATE NUMBER OF FLIGHT TOTAL HOURS BY WHOM ...
Страница 26: ......
Страница 27: ......
Страница 28: ......
Страница 29: ......
Страница 30: ......
Страница 31: ......
Страница 32: ......
Страница 33: ......
Страница 34: ......
Страница 35: ......
Страница 36: ......
Страница 37: ......
Страница 38: ......
Страница 39: ......
Страница 40: ......
Страница 41: ......
Страница 42: ......