Aeronaut Rambotator Скачать руководство пользователя страница 8

76

77

78

74

75

72

73

69

70

71+67

79

81

80

46

93

124

248

23

24

Thread the railing stanchions (79) onto the lower rails (80) and the handrail 
(81), bending all three rails at the same time. Insert the railing stanchions in 
the holes in the engine room roof. Position the railing components carefully 
before gluing the rails to the stanchions.
Allow these assemblies to dry before removing and painting them

The mast (72)
If you wish to fit working lights, drill 2 mm Ø holes in the mast below the lamp brackets for 
the wires to pass through.
Glue the platform supports (75) and the lamp platforms (74) to the mast at the locations 
shown in the illustration.
The mast can now be painted.
Paint the upper and lower parts of the lamps (76 + 77) black.
When the paint is dry, glue the clear lenses (78) between them.
When the mast is complete, slip it through the holes in the wheelhouse roof, the floor and 
the engine room deck, and secure it by fitting the collet (73) at the bottom.
The wheelhouse as a whole is prevented from rotating by the railings, and is held in position 
by the mast collet. If you wish, the wheelhouse can be secured with a small woodscrew 
fitted from the underside.

Содержание Rambotator

Страница 1: ...dry out fully before starting the next stage of construction We recommend a fast setting waterproof white glue for all joints We recommend that you apply a coat of sanding sealer Order No 7666 02 to a...

Страница 2: ...lue to set hard Caution The slots for the servo plate are located 22 mm below deck level Glue the corner fillets 5 6 in place Glue the transom 4 and the bow plate 8 to the corner fillets 5 6 and the h...

Страница 3: ...he motor and shaft rotate freely and smoothly and make any adjustments required to the openings in the hull bottom and the bottom edge of the motor mount Glue the servo mount 14 15 to the hull bottom...

Страница 4: ...he wheelhouse base to the inside edges of the doubler 21 repeat the procedure with the hatch coaming 23 24 and the hatch doubler 20 Caution the hatch coaming is designed to be a very tight fit as it h...

Страница 5: ...ow be attached to the hull apply plenty of glue to all the joint surfaces of the hull and deck beams and place the deck in position Fix the parts together temporarily using strips of adhesive tape Tur...

Страница 6: ...1 as this guarantees a firm seating and makes it easier to fit and remove the whole wheelhouse Glue the portholes 88 in place as shown Prime and paint this assembly Bulwark Insert the bulwark stanchio...

Страница 7: ...d paint this assembly Assemble the instruments as shown in the drawing paint them and install them once the wheelhouse has been painted After painting the wheelhouse glue the door in place the door hi...

Страница 8: ...ow the lamp brackets for the wires to pass through Glue the platform supports 75 and the lamp platforms 74 to the mast at the locations shown in the illustration The mast can now be painted Paint the...

Страница 9: ...25 94 86 All the windows 95 can now be installed and the screen wiper 94 fitted...

Страница 10: ...ler 19 to the shaft This holds the rudder in the correct position and at the same time provides a waterproof seal Bend the rudder pushrod 93 to shape and connect it to the servo output arm and the til...

Страница 11: ...2mm 26 Maschinenhauss ll vorn hinten 2 3 Laserteil Sperrholz 2mm 27 Luke vorn hinten 2 3 Laserteil Sperrholz 2mm 28 Luke seitlich 2 3 Laserteil Sperrholz 2mm 29 Deckel 1 3 Laserteil Sperrholz 2mm 30 M...

Страница 12: ...Laserteil Sperrholz 1 5mm 69 Maschinenraumluke 1 2 Laserteil Sperrholz 2mm 70 Scharnier 2 MS Rohr 3 0 x 0 7 x 8mm abl ngen 71 Hebel 2 4 Laserteil Sperrholz 1 5mm 72 Mast 1 MS Rohr 5 0 x 0 7 x 280mm a...

Отзывы: