background image

G

S1

5

About This Document

www.aerocompact.com

7

o

Improper use

o

use of non-certified components.

o

unauthorized modifications to the product.

o

improper handling of the product.

o

Installation errors

o

Failure to comply with the installation instructions or planning documents.

Guarantee

The warranty period for the system is 25 years. The warranty period for galvanized steel parts is 10 years. The
guarantee is only valid if the installation is carried out professionally and all system components are pur-
chased from Aerocompact. If the assembly instructions or the planning documents are disregarded, the war-
ranty will be invalidated.

Photovoltaic racking systems are not maintenance-free. Perform maintenance annually and immediately
after unusual weather events, e.g., after heavy storms or heavy snowfall, etc. If the maintenance is not carried
out at the specified interval, the warranty will become void.

General information on liability

We would like to point out that the flat roof system is being sold as part of a sales contract. Assembly/-
processing by the purchaser or third parties is not carried out on behalf of or for Aerocompact and must be
carried out by qualified personnel strictly in accordance with the assembly instructions. The Aerocompact
system must be designed and planned with the AEROTOOL software. Aerocompact is not responsible for the
project-related structural integrity of the roof structure, for obtaining and documenting the roof man-
ufacturer's approval for the installation of the corresponding fasteners on the respective roof (in terms of
warranties), nor for the professional execution.

Errors and damage as well as limited or insufficient functionality of the system due to incorrect installation
and/or installation that deviates from the installation instructions and/or the project report (AEROTOOL)
exclude any material defect for which Aerocompact is responsible. In the event of improper handling, the
buyer's rights of warranty for material defects shall not longer be valid. The system warranty is only valid if
all system components are purchased from Aerocompact.

Systems with clamping on the short side of the module

For a system with a clamp on the short side of the module, it is assumed that the module may also be used
with this installation method (clamp on the short sides of the module). This approval can either be generally
available as part of the module certification or, under certain circumstances, can also be given by the mod-
ule manufacturer on a project-specific basis.

Systems with roof protection pads

The roof protection pad included in the scope of delivery is matched to the roof surface defined in the pro-
ject. Due to the many available roof surfaces on the market, the responsible designer should ensure the com-
patibility of and the coefficient of static friction between the protection pad and the roof surface of the
building used in the design. The friction value can be determined during the planning process with a coef-
ficient of friction test.

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

Содержание CompactGROUND GS15

Страница 1: ...CompactGROUND GS15 Assembly Instructions Version 01 Language English Original language German Original installation instructions Important Read carefully before installation...

Страница 2: ...ctions in another lan guage are a translation of the assembly instructions in German The assembly instructions are protected by copyright Without written permission from AEROCOMPACT the assembly instr...

Страница 3: ...ment PPE 10 System Overview 11 Basic components GS15 11 Ballasting 12 Accessories 12 Accessories for grounding potential equalization USA 12 Variants 14 Assembly 15 Attach roof protection pad optional...

Страница 4: ...GS15 www aerocompact com 4 Disassemble components 28 Dismantle clamps 28...

Страница 5: ...ons symbols terms and abbreviations are used The following symbols indicate notes which are not relevant to safety but which make working with the assembly instructions easier Requirements for an acti...

Страница 6: ...documents supplied PV modules used with the CompactGROUND GS system should be approved by the module manufacturer AEROCOMPACT accepts no liability for loss of performance or damage of any kind to the...

Страница 7: ...oof structure for obtaining and documenting the roof man ufacturer s approval for the installation of the corresponding fasteners on the respective roof in terms of warranties nor for the professional...

Страница 8: ...GS15 About This Document www aerocompact com 8...

Страница 9: ...ace Define walking routes and secure them with load distribution measures On roofing or roof structures that do not have sufficient load bearing capacity e g thin sheets corrugated fibre cement always...

Страница 10: ...alling objects Where this does not succeed affected areas must be closed to the public Persons involved in the construction project must wear safety helmets Personal protective equipment PPE Personal...

Страница 11: ...VERVIEW Basic components GS15 1 End clamp varying clamp height for 30 50 mm frame heights CLEG10 XX 2 End bracket GS15 G1S5EB 3 Connector bracket GS15 shading angle 18 25 GS15CNS 4 Front bracket GS15...

Страница 12: ...2300 2 Short ballast tray BT 880 3 Tapping combi screw M8x20 SCS8x20 Accessories 1 Cable conduit CP 430 CP 620 CP 840 2 Bracket for cable conduit BR CP 3 Roof protection pad 290 x 100 x 3 8 PP290 100...

Страница 13: ...GS15 System Overview www aerocompact com 13 1 Grounding lug with nut follows UL 476 or UL 2703 requirements GL18N...

Страница 14: ...GS15 System Overview www aerocompact com 14 Variants System GS15 21 85 in inter row 25 shading angle 15 75 in ground clearance...

Страница 15: ...gs except for green roofs Make sure that the underside of the brackets is clean dry and free of grease and dust Wipe the under side with a clean and dry cloth For the bracket make sure that the roof p...

Страница 16: ...rocompact com 16 Remove protective paper Attach adhesive surface to the underside of the bracket Pre install the clamps Attach end clamps or mid clamps to the front brackets back brackets and connecto...

Страница 17: ...length of the array field and mark the line Measure the width of the array field and mark the line Place brackets and connector brackets in the array field Vertical field edge Place front brackets en...

Страница 18: ...CLP M The distance between the clamps is determined by the brackets and connector brackets or by the mod ule size Hold the front brackets in place with a ballast block Place the module on the front b...

Страница 19: ...Tighten the screws at the mid clamps between the modules with 20 Nm or 14 75 ft lbs Tighten the screws on the upper and lower end clamps of the mounted modules with 20 Nm or 14 75 ft lbs Install remai...

Страница 20: ...aced directly on the brackets or connector bracket Take note of the exact number and position of the ballast blocks from the AEROTOOL planning doc uments Place the ballast blocks Version 2 Short balla...

Страница 21: ...connector bracket Screw the ballast tray to the bracket or connector bracket with the tapping combi screw Tighten the screws with 15 Nm or 11 ft lb Version 3 Long ballast tray The long ballast tray ca...

Страница 22: ...ballast tray to the bracket or connector bracket with the tapping combi screw Tighten the screws with 15 Nm or 11 ft lb Install cable pipe assembly optional The cable pipes can be installed at the edg...

Страница 23: ...ket or to the bracket Tighten the screws with 15 Nm or 11 ft lb Fasten cable pipes with brackets Slide the cable pipe through the brackets Attach the plastic caps to the end of the cable pipe Tighten...

Страница 24: ...ercially available cable lug in accordance with national regulations cer tifications Use a suitable bolt M6 washer and self locking nut The grounding materials must be provided by the customer cable l...

Страница 25: ...e field on a bracket The grounding potential equalization can be mounted together with the ballast trays Mount the grounding lug at the bracket using the screw washer split ring and nut Attach an appr...

Страница 26: ...GS15 Assembly www aerocompact com 26...

Страница 27: ...ance items once a year A test of the system is necessary after severe weather events e g wind storm snow hail etc as well as after extreme events such as a hurricane or earthquake Complete System Chec...

Страница 28: ...m 28 DISMANTLING Disassemble components Disassembling the system Carry out the assembly steps in reverse order Dismantle clamps Completely unscrew the screw on the clamp If clamps are re installed Mak...

Отзывы: