G
S1
5
Assembly
www.aerocompact.com
25
Remove existing screw.
Connect ground wire
firmly to cable lug
.
Fasten the cable lug to the base
using the screw, washer and self-locking nut.
Installing grounding (USA-compliant)
The grounding / potential equalization is mounted at the edge of a module field on a bracket.
The grounding / potential equalization can be mounted together with the ballast trays.
Mount the grounding lug
at the bracket using the screw
, washer
, split ring
and nut
.
Attach an appropriately sized copper grounding wire (provided by customer)
to the grounding lug
with the screw
.
Potential equalization during maintenance
Attention!
If a module is removed, attach additional ground clamps and ground wire to ensure connection between
modules and equipotential bonding.
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+