![AERMEC GLL10N Скачать руководство пользователя страница 15](http://html.mh-extra.com/html/aermec/gll10n/gll10n_installation-manual_2862015015.webp)
15
E
nglish
AGLL10/20NIJ 07/11 - 4528566_00
20°
10°
Position of the fins in cooling operation
opening 10°
Position of the fins in heating operation
opening 20°
When the fins are closed, ventilation is permitted.
In heating operation, a fin opening
of 20° is recommended; this is indi-
cated by a raised line on the fins
themselves (see figures).
In cooling operation, a fin opening of
10° is recommended; this is indi-
cated by a raised line on the fins
themselves (see figures).
When the louvres are closed ventila-
tion is permitted.
Fins position (GLL10N)
50%
Position of the fins in cooling operation
half open
Position of the fins in heating operation
completely open
When the fins are closed, ventilation is permitted.
In heating operation, the full open-
ing of the fins is recommended (see
figures).
In cooling operation, a 50% fin
opening is recommended (see fig-
ures).
When the louvres are closed ventila-
tion is permitted.
Fins position (GLL20N)
Содержание GLL10N
Страница 49: ......