USER MANUAL
COOLMAX SRX – Wall Mount
Australian Energy Research Labs
AER09 – Rev 1.1
12
th
March 2022
8
AER09 REV 1.1
Standards & Requirements
All installations must comply with national and local electrical standards and codes of practice. AERL
recommends professional installation.
Grounding
CoolMax Charge Controllers are designed to be installed in floating systems but contain provisions for positive
functional earthing for telecom applications if required.
Installation
IMPORTANT
CAUTION – Equipment Damage
The CoolMax SRX must be installed in a clean, dry location away from direct sunlight.
Optimal cooling is achieved when the COOLMAX SRX is mounted vertically. A minimum of 15cm
should be kept clear above the COOLMAX SRX to allow for cooling.
CoolMax Charge Controllers are not designed to be used in parallel with other Third-
Party Charge Controllers and this will void your warranty.
IMPORTANT
The Chassis Ground (located inside the enclosure) is marked with the following symbol:
CAUTION – Hazard
If damaged or malfunctioning, the AERL controller should only be disassembled and
repaired by a qualified service centre. Please contact the local renewable energy
dealer/installer for assistance.
Incorrect reassembly risks malfunction, electric shock, or fire.
DO NOT FUNCTIONALLY EARTH THE ARRAY
if a negative earth is used for the batteries, load or DC
system.
CAUTION – Hazard