INSTALLATION, OPERATION & MAINTENANCE
ii
TABLE OF CONTENTS - Continued
Chapter/Paragraph
Page
4.8
GAS MAINS AND CONNECTION
4-3
5 ELECTRICAL
5-1
5.1 ELECTRICAL
CONNECTIONS
5-1
5.2
D.H.W. STORAGE TANK
5-2
5.3 ENABLE/DISABLE
5-2
5.4
INSTALLATION OF SENSORS
5-2
6 BOILER
OPERATION
6-1
6.1
GENERAL DESCRIPTION AND OPERATION
6-1
6.2 MODULATION
THEORY
6-1
6.3 IGNITION
SEQUENCE
6-2
6.4
MODES OF OPERATION
6-2
6.4.1
INDOOR/OUTDOOR
RESET
6-2
6.4.2
0 TO 10 VOLT REMOTE SET-POINT
6-3
6.4.3
CONSTANT
SET-POINT
6-3
6.4.4
BOILER OPERATION IN CASE OF TROUBLESHOOTING
(MANUAL MODE)
6-3
6.5
MODULEX BOILER INITIAL STARTUP
6-3
6.5.1
TOOLS & INSTRUMENTION REQUIRED FOR COMBUSTION
CALIBRATION
6-4
6.5.2
INSTALLATION OF SUPPLY GAS MANOMETER
6-4
6.5.3
PREPARING THE FLUE FOR USE WITH THE COMBUSTION
ANALYZER
6-5
6.5.4
COMBUSTION
CALIBRATION
6-6
6.6 UNIT
REASSEMBLY
6-8
7 MAINTENANCE
7-1
7.1 MAIN
FEATURES
7-1
APPENDIX A
TEMPERATURE SENSOR RESISTANCE CHART
A-1
APPENDIX B
MODULEX PARTS LIST
B-1
Содержание Modulex 1060
Страница 12: ...INSTALLATION OPERATION MA 1 4 INTENANCE Figure 1 1 Modulex Dimensions and Weights Sheet 2 of 2 ...
Страница 16: ......
Страница 25: ...INSTALLATION OPERATION MAINTENANCE 2 9 Figure 2 7 Sample Data Plate ...
Страница 33: ...INSTALLATION OPERATION MAINTENANCE 5 3 Figure 5 2 ...
Страница 34: ......
Страница 44: ......
Страница 51: ...APPENDIX A A 1 APPENDIX A Temperature Sensor Resistance Charts ...
Страница 53: ...APPENDIX B B 1 APPENDIX B Modulex Parts List ...
Страница 54: ...APPENDIX B B 2 ...
Страница 55: ...APPENDIX B B 3 ...
Страница 56: ...APPENDIX B B 4 ...
Страница 58: ......