background image

SOI  06.09  FV 

5/10 

599 72 00-47 

2 -  ELECTRICAL DIAGRAMS 

 

2.1 -  BASIC DIAGRAM 

 
 
 
 
 

Reed 

Sensor 

IFD Boiler Temp. 

Sensor 

 

Control  

Board 

Hall 

Sensor 

Water Flow 

Meter 

 

Motor Filter Board 

Ifusor Group

Motor

Grinder Motor  

S

te

a

m

 H

e

at

in

Element 

Coffee

 Heating 

Element 

Steam val

v

e

 2 wa

Di

scha

rge val

v

e

 2 wa

P

ump

 

Coffee 

Temperature 

Sensor 

LED 

Board 

Cooling Fan 

Motor 

Pump Thermal 

Proctector

  

Содержание EBA6310X

Страница 1: ...SOI 06 09 FV 599 70 00 47 SERVICE MANUAL COOFEE MAKERS 599 72 00 47 SOI Edition 06 2009 Rev 00 EN SERVICE FV Coffee maker for built in installation JBA63810X EBA6310X P3810 M QCA6000X ...

Страница 2: ...SOI 06 09 FV 2 10 599 72 00 47 ...

Страница 3: ...A page 4 1 1 COFFEE SECTION page 4 1 2 STEAM SECTION page 4 2 ELECTRICAL DIAGRAMS page 5 2 1 BASIC DIAGRAM page 4 2 2 WIRING DIAGRAM page 4 3 OPERATING ELEMENT TEST PROCEDURE page 7 4 DISPLAY TEST PROCEDURE page 8 5 WATER FLOW DIAGRAM page 9 6 GRIDER SET UP page 10 ...

Страница 4: ...x imput power 1350 W 1 1 COFFEE SECTION Coffee temperature probe 98 C Hot water temperature probe 98 C Thermal fuse TCO 192 C Heating element 600 600 W Pump Type ULKA EP5 Power 48 W 1 2 STEAM SECTION Steam temperature probe 145 C Thermal fuse TCO 318 C Heating element 1000 W ...

Страница 5: ...IFD Boiler Temp Sensor Control Board Hall Sensor Water Flow Meter Motor Filter Board Ifusor Group Motor Grinder Motor Steam Heating Element Coffee Heating Element Steam valve 2 way Discharge valve 2 way Pump Coffee Temperature Sensor LED Board Cooling Fan Motor Pump Thermal Proctector ...

Страница 6: ...SOI 06 09 FV 6 10 599 72 00 47 2 2 WIRING DIAGRAM ...

Страница 7: ...e Steam Solenoid 1 Solenoid 2 TASTE Grinder motor LOAD TEST MODE When the appliance is in stand by mode not operating and the main switch however in position I open the service door and press simultaneously the icons MENU 1 CUP and HOT WATER for at least 8 seconds until the message SELECT TEST is displayed Then close the service door and press the LIGHT icon the text LOAD TEST MODE is displayed LI...

Страница 8: ...ce is in stand by mode not operating and the main switch however in position I open the service door and press simultaneously the icons MENU 1 CUP and HOT WATER for at least 8 seconds until the message SELECT TEST is displayed Then close the service door and press the MENU the text DISPLAY TEST MODE is displayed Steam BUTTON 10 The access to display mode sets back the selected language and activat...

Страница 9: ...5 WATER FLOW DIAGRAM Water pump Water flowmeter Water tank Coffee outlet Coffee heating element Exaust solenoid valve Steam heating element Temperature sensor Solenoid valve for steam and hot water Dispensing tube Temperature sensor ...

Страница 10: ...educe the coarseness fine coffee Turnr the gear counterclockwise to increase the coarseness thicker Insert the white shaft making sure its longer notch is aligned with the one on the grinder Insert the white ring making sure its notch as well is inserted on the correct position Turn the shaft CLOCKWISE till it stops to insert the upper gear Then turn the shaft all the way COUNTERCLOCKWISE before c...

Отзывы: