Quick Ref - Synchronising Two Sounders (All stages)
1
Connect Synch cable to
Master and Slave PCB
2
Set 1 off Units as Master
and 1 off Unit as Slave
Set jumper to SY on
Set jumper MA on Master
unit to master position
(on)
Set jumper MA on Slave
unit to slave position (off)
Position of S2 switch
does not affect synch
operation.
3
Switch on power onto the
Master unit first
Then switch power onto
the Slave unit
Master Unit
Slave Unit
4a
Press action button on the
Master Unit:
Synchronisation will begin
(Duration 13 Minutes)
Master Unit
Slave Unit
4b
- - - - Synchronisation
complete
Switch off Power to units
Master Unit
Slave Unit
5
Reset on both units
jumper SY to off
Set jumper MA on both
units to Master position
(on)