AE Conversion PLC Gateway Скачать руководство пользователя страница 5

5

11.2013

Gateway

• 

The voltage in grids at IT configuration shall not 

exceed 240V AC!

• 

NOTE:  

For changing the internal fuse resistor inside the 

gateway it must be sent to AEconversion for service. 

There are no serviceable parts inside. The integrated 

fuse (R65 CRF253-4 5 T 10R Vishay) is not allowed to 

be change. 

• 

Do not connect the gateway and the inverter to 

grids without an earthed neutral conductor.

 2.2 Label

The label is located on the top side of the gateway. 

The information on the label includes technical data, 

type and serial number of the device as well as safety 

instructions.

3.0 Notes on Liability, Warranty and Service

Remarks on liability, warranty and service are listed 

hereafter.

3.1 Guaranty and Warranty 

AEconversion grants an implied warranty of 2 years 

to the gateway from date of purchase. For warranty 

questions, please contact your retailer or installer. If your 

device has a defect or malfunction during the warranty 

period, please also contact your retailer or installer. 

Warranty claims are excluded for: 

• 

alterations or repairs to the device

• 

opening of the device, for example by unscrewing 

the cover

• 

improper use of device

• 

improper and non-standard installation

• 

improper operation 

• 

operating the equipment with defective safety 

devices

• 

impact of foreign objects and force majeure 

(lightning, surge, storm, fire) 

• 

inadequate or nonexistent ventilation of the device 

• 

disregarding of safety regulations 

• 

shipping damage

3.2 Intended use and liability

The AEconversion PLC Gateway is intended for use 

in combination with the INV250-45 PLC/ INV350-60 

PLC/ INV350-90 PLC/ INV500-90 PLC, which use the AC 

wiring to communicate. The AEconversion PLC Gateway 

provides the connection between the inverters to the 

utility grid. But furthermore, the gateway builds the 

WARNING! 

These servicing instructions are for use by qualified 

personnel only. To reduce the risk of electric shock, do 

not perform any servicing other than that specified in 

the operating instructions unless you are qualified to do 

so.

2.0 Storage and Transportation

For storage and transport, the following warnings are to 

be noted:

• 

All contacts should be kept dry and clean!

• 

Transport the Gateway only in the given packaging.

2.1 Assembly, Installation, Operation and Maintenance 

The following warnings must be observed: 

Before installing or using the AEconversion PLC Gateway 

and the AEconversion Micro-Inverter, please read 

all instructions and note the threats, warnings, and 

precautions.

• 

WARNING!  

Proper grounding, wire sizing and appropriate 

short-circuit protection must be provided to ensure 

safe operation.  

• 

Never remove the solar generator from the inverter, 

while it is connected to the electricity network.

• 

Make sure that before carrying out inspections and 

maintenance, the inverter is disconnected from the 

mains supply and is secured against restarting.

• 

CAUTION:  

Perform all electrical installations in accordance 

with the safety regulations all applicable local 

electrical codes and the National Electrical Code 

(NEC), ANSI/NFPA 70.  

• 

Connect the AEconversion Micro-Inverter to the 

electricity network only after receiving prior 

approval from the electrical utility company.

• 

The electrical connection to the central building 

shall be performed only by a licensed electrician.

• 

If you mount the inverter at high altitude, avoid 

possible falling risks.

• 

Do not plug electrically conductive parts into the 

plugs and sockets! Tools and working conditions 

must be dry.

• 

Do not under any circumstances interfere with 

or manipulate the inverter or any other parts of 

the system; it contains no user-serviceable parts. 

Inappropriate alterations can cause damage! 

Tampering with or opening the AEconversion PLC 

gateway will void the warranty.

• 

The installation shall be done according to the 

wiring methods and wire diameters in accordance 

with the National Electrical Code (NEC), ANSI/NFPA 

70. For Connection schemes refer also pages 12 /13.

Содержание PLC Gateway

Страница 1: ...Micro Inverter English Installation Manual PLC Gateway ...

Страница 2: ...ATION Product information is subject to change without notice All trademarks are recognized as the property of their respective owners Copyright 2012 AEConversion GmbH Co KG All rights reserved IMPORTANT SAFETY INSTRUCTIONS SAVE THESE INSTRUCTIONS THIS MANUAL CONTAINS IMPORTANT INSTRUCTIONS FOR THE AECONVERSION PLC GATEWAY THAT SHALL BE FOLLOWED DURING INSTALLATION AND MAINTENANCE OF THE GATEWAY ...

Страница 3: ...y 7 4 3 LED Light 7 4 4 Protection Concepts 7 5 0 Gateway Pre Installation 7 5 1 Parts and Tools Required 7 5 2 Lighting Surge Protection 8 6 0 Installation Procedure 8 6 1 Measure AC at the Electrical Utility Connection 8 6 2 Mount the Gateway 8 6 3 Connect to Inverters and Grid 8 6 4 Connect RS485 Bus 9 6 5 Install and Start Software 10 7 0 Troubleshooting 10 7 1 Troubleshooting aCommunication S...

Страница 4: ...onal Electrical Code NEC ANSI NFPA 70 Be aware that only qualified personnel should install or replace AEconversion PLC Gateway Do not attempt to repair the AEconversion PLC Gateway it contains no user serviceable parts Tampering with or opening the AEconversion PLC Gateway will void the warranty WARNING Do NOT disconnect the Gateway from the installation without first removing AC power For damage...

Страница 5: ...ly To reduce the risk of electric shock do not perform any servicing other than that specified in the operating instructions unless you are qualified to do so 2 0 Storage and Transportation For storage and transport the following warnings are to be noted All contacts should be kept dry and clean Transport the Gateway only in the given packaging 2 1 Assembly Installation Operation and Maintenance T...

Страница 6: ...onditions radiation were present at the time of the error 2 Information about the PV installation How many Powerline Micro Inverters are installed in the system What AC nominal voltage is used 3 4 Scope of Delivery The package includes Gateway Two wall mounting tabs and screws Quick Start Guide and further information on CD 4 0 Product Description The AEconversion PLC Gateway provides the connecti...

Страница 7: ...0 6 1 DIN EN 61000 6 2 DIN EN 61000 6 3 DIN EN 61000 6 4 DIN EN 61000 3 2 DIN EN 61000 3 3 Concerning interference resistance transient emissions circuit feedback for device types 16A 2006 95 EC Directive on electrical equipment designed for use within certain voltage limits according to IEC55011B EMC IEC 60950 UL60950 Safety EIA 485 RS485 Standard Connection of the data cable to Superior Systems ...

Страница 8: ...on the AC cabling to be sure that the cable matches the electrical utility service at the site Use 208 VAC 208 VAC three phase cabling at sites with three phase 208 VAC service or use 240 VAC cabling at sites with 240 VAC single phase service Use 240 VAC cable at sites with 208 single phase service Please refer to page 12 208V and 13 240V for wiring diagrams NOTE The operation at grids with neutra...

Страница 9: ...he A and B of one gateway to the A and B of the next and so on The last gateway is then connected respectively from A and B of the gateway to A and B of the bus master here USB RS485 Interface Adapter The restrictions to the maximum number of allowable units in one circuit branch are as follows 60 Hz US 60Hz 240V Installations 20A Circuit Breaker US 60Hz 208V Installations 20A Circuit Breaker Type...

Страница 10: ...ns once the AC branch circuit breaker in the load center has been opened WARNING Open all ungrounded conductors of the circuit to which it is connected 7 1 Troubleshooting a Communication System WARNING Be aware that only qualified personnel should troubleshoot the PV array AEconversion Micro Inverter or the AEconversion PLC Gateway To troubleshoot an inoperable Communication System follow the ste...

Страница 11: ...ation of stability the thermal protection and the aging behavior is required for retrospective installation To comply with the regulations on accident prevention the use of safety systems safety belt scaffolding arresting gear etc may be required These security systems are not included and must be ordered separately The installation must be performed by professionally qualified and authorized pers...

Страница 12: ...es a reliable filter to shield communication from external interferences The system data is provided at the RS485 port In order to connect all inverters with a central monitoring station eg the AEconversion Data Logger the gateways can be connected in parallel to the RS485 bus Interfaces RS485 PLC Additional Information Safety standards safety class II Product safety IEC 60950 EMC FFC Part 15 Clas...

Страница 13: ...13 11 2013 Gateway Wiring Diagrams 208V NOTE The operation at grids with neutrals which are not grounded is not allowed NOT APPROVED ...

Страница 14: ...14 Gateway 11 2013 Wiring Diagrams 240V NOTE The operation at grids with neutrals which are not grounded is not allowed NOT APPROVED ...

Страница 15: ...15 11 2013 Gateway AEConversion GmbH Co KG Geseker Str 3 59494 Soest Germany Phone 49 0 521 329471 0 Fax 49 0 521 329471 29 www aeconversion com ...

Отзывы: