
5
11.2013
Gateway
•
The voltage in grids at IT configuration shall not
exceed 240V AC!
•
NOTE:
For changing the internal fuse resistor inside the
gateway it must be sent to AEconversion for service.
There are no serviceable parts inside. The integrated
fuse (R65 CRF253-4 5 T 10R Vishay) is not allowed to
be change.
•
Do not connect the gateway and the inverter to
grids without an earthed neutral conductor.
2.2 Label
The label is located on the top side of the gateway.
The information on the label includes technical data,
type and serial number of the device as well as safety
instructions.
3.0 Notes on Liability, Warranty and Service
Remarks on liability, warranty and service are listed
hereafter.
3.1 Guaranty and Warranty
AEconversion grants an implied warranty of 2 years
to the gateway from date of purchase. For warranty
questions, please contact your retailer or installer. If your
device has a defect or malfunction during the warranty
period, please also contact your retailer or installer.
Warranty claims are excluded for:
•
alterations or repairs to the device
•
opening of the device, for example by unscrewing
the cover
•
improper use of device
•
improper and non-standard installation
•
improper operation
•
operating the equipment with defective safety
devices
•
impact of foreign objects and force majeure
(lightning, surge, storm, fire)
•
inadequate or nonexistent ventilation of the device
•
disregarding of safety regulations
•
shipping damage
3.2 Intended use and liability
The AEconversion PLC Gateway is intended for use
in combination with the INV250-45 PLC/ INV350-60
PLC/ INV350-90 PLC/ INV500-90 PLC, which use the AC
wiring to communicate. The AEconversion PLC Gateway
provides the connection between the inverters to the
utility grid. But furthermore, the gateway builds the
WARNING!
These servicing instructions are for use by qualified
personnel only. To reduce the risk of electric shock, do
not perform any servicing other than that specified in
the operating instructions unless you are qualified to do
so.
2.0 Storage and Transportation
For storage and transport, the following warnings are to
be noted:
•
All contacts should be kept dry and clean!
•
Transport the Gateway only in the given packaging.
2.1 Assembly, Installation, Operation and Maintenance
The following warnings must be observed:
Before installing or using the AEconversion PLC Gateway
and the AEconversion Micro-Inverter, please read
all instructions and note the threats, warnings, and
precautions.
•
WARNING!
Proper grounding, wire sizing and appropriate
short-circuit protection must be provided to ensure
safe operation.
•
Never remove the solar generator from the inverter,
while it is connected to the electricity network.
•
Make sure that before carrying out inspections and
maintenance, the inverter is disconnected from the
mains supply and is secured against restarting.
•
CAUTION:
Perform all electrical installations in accordance
with the safety regulations all applicable local
electrical codes and the National Electrical Code
(NEC), ANSI/NFPA 70.
•
Connect the AEconversion Micro-Inverter to the
electricity network only after receiving prior
approval from the electrical utility company.
•
The electrical connection to the central building
shall be performed only by a licensed electrician.
•
If you mount the inverter at high altitude, avoid
possible falling risks.
•
Do not plug electrically conductive parts into the
plugs and sockets! Tools and working conditions
must be dry.
•
Do not under any circumstances interfere with
or manipulate the inverter or any other parts of
the system; it contains no user-serviceable parts.
Inappropriate alterations can cause damage!
Tampering with or opening the AEconversion PLC
gateway will void the warranty.
•
The installation shall be done according to the
wiring methods and wire diameters in accordance
with the National Electrical Code (NEC), ANSI/NFPA
70. For Connection schemes refer also pages 12 /13.