![ADVANTEST R3264 Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/advantest/r3264/r3264_operation-manual_2858762019.webp)
R3267 Series OPT11 3GPP Level Calibration Operation Manual
5. PERFORMANCE VERIFICATION TEST
5-1
5.
PERFORMANCE VERIFICATION TEST
A list of GPIB codes required for remote control is shown in this section.
5.1
GENERAL
5.1.1
Introduction
This chapter provides R3267 Series OPT11 performance verification test procedures.
5.1.2
Test Equipment
The Table 5-1 lists recommended test equipment.
The equipment needed to perform all of the performance test.
Equipment lists for individual tests are provided in each performance verification test.
CAUTION:
1.
The R3267 Series with OPT 11 to be tested should be warm up for at least 60 minutes before starting test.
2.
Make sure that the test equipment used meets its own published specifications.
3.
Any equipment that meets the critical specifications given in the table can be substituted for recommended
models.