4.3.3
Power Management Parameter settings
The parameters for power management on TREK-520 could be set by Demo program
(see the image below) or SDK/API.
Figure 4.9 power management demo utility
Figure 4.9 Off event delay
Off Event Delay
– it means after 5 seconds delay from receiving of ignition OFF signal,
EC controller will send a shutdown event to make system start shutdown process
Figure 4.9 Hard Off delay
Hard off Delay
– it means after 30 seconds from shutdown event, EC controller will
force power cut off at the same time.
31
www.advantech.com
Содержание TREK-520
Страница 1: ...User Manual TREK 520 Computer...
Страница 18: ...Chapter 3 Pin Assignments This appendix explains pin assignments on the TREK 520...
Страница 19: ...3 1 Front Side Connectors 3 2 Rear Side Connectors...
Страница 24: ...Figure 4 2 J1939 truck simulator Figure 4 3 Figure 4 4 TREK 520 User Manual 22 24 www advantech com...
Страница 37: ...37 www advantech com Appendix A This appendix explains the TREK 303 detailed information...
Страница 39: ...TREK 303 Specification TREK 303 demo SW application program Figure 6 17 39 www advantech com...