ENERGY MONITORING BUNDLE
12
POWER UP WZZARD EDGE NODE
1. Loosen the (4) black screws that hold the top of the node in place.
2. Install your batteries.
Note: Use (2) 3.6V 2400 mAH Lithium Thionyl Chloride AA batteries.
3. Install the battery clip.
4. Replace the cover. Tighten the (4) top screws to maintain IP67 rating. Torque each screw to 5
to 8 in-lb (0.6 to 0.9 Nm). This is equivalent to 1/4 to 1/2 turn after screw makes contact.
5. Check LED.
After you have installed the batteries, the LED will begin to blink. This indicates that the Node is
attempting to establish a network connection. The LED will cease blinking when a connection is
made.
6. Attach the External Antenna.
Note:
The best way to remove the clip is to insert a
small flathead screwdriver between the batteries
and the clip, parallel to the batteries, and give the
screwdriver a gentle twist. This will remove the clip
without damage.
LED Indicator
Status
Data
Solid ON
Module startup initialization (approx. 10 seconds)
Slow Blink
(1 per second)
Attempting to establish connection with SmartMesh IP network.
Fast Blink
(10 per second)
Firmware update in progress.
OFF
Unit is connected to wireless network.