and the water supply will fill the reservoir tank. Do not use automatic fill when
operating at temperature below 48°F.
5.
MANUAL FILL: Add fluid directly to the reservoir. When the pump is first started,
as process lines are filled and air is purged, additional fluid may be required to
restore the reservoir to the correct level. Verify reservoir level via the coolant
sight glass.
6.
Do not use deionized water in this unit unless your unit was specifically designed
for use with deionized water. Consult factory if not certain.
7.
The tank is normally equipped with an automatic water make-up system. One of
several automatic make-up systems may be used on your system.
a.
Mechanical automatic water make-up with a Hudson Float.
b.
Mechanical level switch that activates a solenoid valve where the level
swtich is located outside of the tank.
c.
Ultrasonic switch that activates a solenoid valve as described in Section
8.5 of this manual.
B.
PROPER ROTATION (PHASING) OF SCROLL COMPRESSORS & PUMPS & FANS
1.
Correct compressor and pump rotation is critical for unit performance and to
avoid severe damage to the compressor.
2.
All models, excluding remote outdoor condenser systems, have their compressor
and pump motors factory phased in unison. Therefore, you should only need to
check one motor to verify phasing. However, we recommend verifying all motor
rotations.
Typical location of Reservoir Sight Glass
Содержание Titan
Страница 2: ......
Страница 6: ...Page 6 THIS PAGE INTENTIONALLY BLANK ...
Страница 24: ...Page 24 THIS PAGE INTENTIONALLY BLANK ...
Страница 50: ...Page 50 THIS PAGE INTENTIONALLY BLANK ...
Страница 58: ...Page 58 THIS PAGE INTENTIONALLY BLANK ...
Страница 74: ...Page 74 THIS PAGE INTENTIONALLY BLANK ...
Страница 94: ...END 2021 ADVANTAGE ENGINEERING INC RE 20210407 ...