Page 19
Single Stage Unitary Range
ES/ESH-LT209_10152019
INSTALLATION
Mitered Reflector Installation
•
If used, install the Mitered Reflector as shown below in Figure 20.
Figure 20: Mitered Reflector Installation
ASSEMBLE CORNER
BRACKET TO MITERED
REFLECTORS AS SHOWN
FASTEN MITERED
REFLECTORS WITH
4 - #8 X
³/
8
" SCREWS
MITERED REFLEC-
TOR SECTIONS
SHOULD OVERLAP
STANDARD
REFLECTORS
NOTE:
CLOSE ALL CHAIN LINKS “S” HOOKS, J BOLTS AND TURNBUCKLES OR ANY OPEN CONNECTION