CAUTION:
All electrical installations should be completed in accordance with national
and local electrical codes. The inverter must be connected to a dedicated
circuit with no other outlets or devices connected to the same circuit.
ATTENTION:
Toutes les installations électriques devraient être faites selon les codes de
l’électricité locaux. Le Code national de l’électricité exige que l’onduleur soit
connecté à un circuit spécialisé sans aucun autre dispositif ou sortie
connecté au même circuit.
The inverter is equipped with a DC disconnect for DC power OFF to stop power
conversion within the inverter. Before accessing the interior of the cabinet, the DC
disconnect must be in the OFF position. Since this disconnect only stops power
conversion within the inverter, both the DC (photovoltaic array) and AC (utility grid)
circuits must be isolated in order to fully ensure that the inverter is de-energized.
Opening the Connection Box
TOOLS REQUIRED
• Allen wrench (Allen wrench adaptor for a socket wrench recommended)
TO REMOVE THE CONNECTION BOX COVER
1. Turn the DC disconnect switch to the OFF position.
2. Remove the screws with spring lock washers on the two left corners of the
connection box cover.
3. Open the cover.
The connection box cover swings to the right on its hinge.
☞
Important
Handle the cover with care. Even minor damage to the cover can create
an inadequate seal between the cover and the connection box, allowing
moisture to penetrate and damage sensitive electronic components.
DC Connection Examples
CAUTION:
The input and output circuits are isolated from the enclosure. System
grounding, when required by national and local electrical code, is the
responsibility of the installer.
Advanced Energy® AE 3TL Inverters
570-1003552-05A
Installing
4‑13
Содержание AE 3TL 1000 Series
Страница 2: ......
Страница 12: ...Advanced Energy xii 570 1003552 05A List of Tables...
Страница 14: ...Advanced Energy xiv 570 1003552 05A List of Figures...
Страница 26: ...Advanced Energy 1 12 Safety and Product Compliance Guidelines 570 1003552 05A...
Страница 64: ...Advanced Energy 4 28 Installing 570 1003552 05A...
Страница 86: ...Advanced Energy 6 4 Operating the Arc Fault Detection Unit 570 1003552 05A...
Страница 92: ...Advanced Energy 7 6 Data Monitoring and Controls 570 1003552 05A...
Страница 110: ...Advanced Energy 9 14 Troubleshooting and Solar Energy Technical Support 570 1003552 05A...
Страница 116: ...Advanced Energy A 6 Specifications 570 1003552 05A...
Страница 118: ...Figure 11 2 AE 3TL mechanical diagram Advanced Energy B 2 System and Mechanical Diagrams 570 1003552 05A...
Страница 120: ...Advanced Energy B 4 System and Mechanical Diagrams 570 1003552 05A...