Total Access 1248 Quad T1 IMA 48-Port DSLAM with Modem Installation and Maintenance Practice
3-4
61179641AL1-5C
INSTALLATION STEPS
The following steps are required to install the Total Access 1248. Each step has an associated
procedure which is referenced below the step. Each procedure provides detailed information
for completing the step.
1. Mount the Total Access 1248 system with the appropriate hardware.
For detailed information, refer to
“Mounting the Total Access 1248”
2. Ground the Total Access 1248.
For detailed information, refer to
3. Make the power connections to the Total Access 1248.
For detailed information, refer to
4. Connect the Ethernet cable to the Total Access 1248.
For detailed information, refer to
5. Connect the DB-15 male alarm cable connector to the Total Access 1248 and wire-wrap
the connections to an alarm panel.
For detailed information, refer to
6. Connect the network cable.
For detailed information, refer to
7. Connect the ADSL2+ plus POTS and POTS cables.
For detailed information, refer to
“ADSL2+ Plus POTS Connections”
8. Turn-up the Total Access 1248.
For detailed information, refer to