Q-110-1                                                                    REV. A                                                                 Page 1 

CM FIRST ARTICLE INSPECTION REPORT (Q110-1)

 

 

Part No. 

 

Rev.  

Sheet  

Of  

Part Name: 

 

Date: 

 

Contract MFR:   

Originator: 

 

 

Work Order No. 

 

Purchase Order No. 

 

(If applicable) 

 

Quantity 
Shipped: 

 

Test(s) conducted 

ICT   

FVT   

Hi POT   

Visual Inspection 

 
ADTRAN Assembly DWGs/specification(s) used 
 

 

 

 

 
First Article unit(s) Serial Number 
 

 

 

 

 

 

 

 

 

Remarks: 
 
 

 1

st

 Submission  

 2

nd

 Submission 

  Tooling Rebuilt/Refurbish 

 

Certification Of Compliance 

I certify that the parts furnished on the above shipment meet all the necessary Engineering Instructions, 
Mechanical Specifications and Necessary Requirements, and that the above parts have been inspected by 
this Company.  A copy of all working documentation used for verification to include deviation notices, 
assembly and label placement drawing(s), BOM and any other written instructions shall be included with 
this First Article Shipment. 

  
Quality Manager____________________________________Date_______________ 

 

 

For ADTRAN use only 

 

Disposition:  

 Approved  

 Rejected   

  Conditional Approval 

 

Resubmission of 1

st

 Article Required?

  

 

YES

   

 

NO

   

 
Remarks: 
 
 
 

Q110-1 – CM First Article Inspection Report, Rev A, page 1 

 

   (Quality Record)

 

Содержание Q-110

Страница 1: ...Q 110 QUALITY PROGRAM REQUIREMENTS FOR ADTRAN CONTRACT MANUFACTURERS Q 110 REV D Page 1 of 11...

Страница 2: ...equipment Revised section 2 8 6th para to reflect approval of alternate labels C 4 21 2004 General update to Outsource Manufacturing guidelines Specifics include a Revised signature line on the Forewo...

Страница 3: ...tal to any form of management or quality control This document shall serve as both a requirement and a general guide to the extent of quality control that ADTRAN anticipates from Contract Manufacturer...

Страница 4: ...tingent upon continued quality of performance satisfactory results of Quality System Audits and or external TL9000 audit reports 1 4 ADTRAN Quality System Audits Contract Manufacturer facilities and o...

Страница 5: ...Non Conforming RMS Material All material used on ADTRAN product shall be listed in the ADTRAN Approved Vendors List AVL and defect free RMS material determined to be wrong discrepant damaged upon init...

Страница 6: ...ll notify the CM of disposition of all First Articles submissions in documented form i e email fax etc 1 8 1 Deviations to Specifications A request for deviation to a drawing or specification must be...

Страница 7: ...hed operation for example a new operator new machine new technique a critical examination shall be made of the first unit s processed after the change is implemented Electro Static Discharge ESD prote...

Страница 8: ...ducts delivered to ADTRAN as required by the Bill of Material It is preferred that shipping containers not exceed a maximum of 35 pounds Each container should have a consistent number of parts except...

Страница 9: ...ract manufacturer shall establish and maintain a documented Quality Improvement Program to improve the quality and reliability of the processes product The program shall be active and contain a priori...

Страница 10: ...shipment meet all the necessary Engineering Instructions Mechanical Specifications and Necessary Requirements and that the above parts have been inspected by this Company A copy of all working docume...

Страница 11: ...OS OTHER Yes No DWG BOM POS OTHER Yes No DWG BOM POS OTHER Yes No DWG BOM POS OTHER Yes No DWG BOM POS OTHER Yes No DWG BOM POS OTHER Yes No DWG BOM POS OTHER Yes No DWG BOM POS OTHER Yes No DWG BOM P...

Отзывы: