background image

Installing the Switch

NetVanta 1570-24-370W QSG

2

617101574PF1-13A

Installing the Switch

Package Contents

■ NetVanta 1570-24-370W switch
■ AC power cord
■ DB-9 to RJ-45 cable
■ Micro-USB to USB cable
■ Four adhesive rubber feet
■ Mounting kit (two brackets and eight screws)
■ Quick Start.

Installation Overview

To install the switch, you will need to do the following:

1. Mount the switch

2. Connect AC Power

3. Install SFP+ Modules

Installation Steps

To install the NetVanta 1570-24-370W switch, complete the following steps:

Mounting the Switch in a 19-inch Rack

To mount the switch into a 19-inch rack, complete the following steps.

1. Attach the mounting brackets to both sides of the chassis. Insert the provided screws and tighten them with a screwdriver to secure the 

brackets.

Figure 3. Attaching Brackets to the Switch

2. Position the chassis in the stationary equipment rack. Allow 1-inch of clearance between units.

NOTE

g

Refer to the national, state and local electrical codes for the requirements for power, grounding, wiring, and installation methods.

CAUTION!

f

The NetVanta 1570-24-370W is intended for indoor use only. Ethernet, PoE cables, and attached equipment are intended for use within the 

same building with equipotential bonding, and not intended to be placed in separate buildings or structures. Failure to deploy as described 

could result in permanent damage from lightning or other electrical events and voids the warranty.

WARNING!

f

This equipment is not suitable for use in locations where children are likely to be present.

Содержание NetVanta 1570-24-370W

Страница 1: ...this equipment NetVanta 1570 24 370W SYSTEM LNK ACT SPD PoE CONSOLE USB MODE RESET 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 LINK ACT SPD Mode LED SYS LED CONSOLE Port...

Страница 2: ...of the chassis Insert the provided screws and tighten them with a screwdriver to secure the brackets Figure 3 Attaching Brackets to the Switch 2 Position the chassis in the stationary equipment rack A...

Страница 3: ...e 5 Attaching the Rubber Feet Supplying Power to the Switch To connect the AC power cord to the switch complete the following steps 1 Connect the AC power cord to the AC power receptacle on the rear p...

Страница 4: ...st comply with the national state and local electrical code requirements as applicable The AC branch circuit overcurrent protection must be a fuse or circuit breaker rated 125 VAC 20 Amps maximum or 2...

Страница 5: ...Select OK to change the PC s IP address 3 Power up the switch to be initially configured and wait until it has finished its start up processes 4 Connect the PC to any port on the switch using a stand...

Страница 6: ...EEE 802 3af PoE and IEEE 802 3at PoE standards By default the PoE switch discovers and provides power to IEEE compliant PDs it also supports legacy PDs The total PoE budget for the switch is 370W Each...

Страница 7: ...no active network cable connected or has not established a link to connected device Oth erwise the port may have been disabled through the switch user interface SFP Ports Green On The port is enabled...

Страница 8: ...derstand the abnormal state e g exceeding operating temperature range and take correspond ing actions to resolve Port Status LED is OFF when the LINK ACT SPD LED is LIT The port is not connected or th...

Страница 9: ...des provide additional information for this ADTRAN product available online at https supportcommunity adtran com Configuring the CLI in ASE Configuring QoS in ASE Configuring Layer 2 Services in ASE C...

Отзывы: