background image

61287802F1-13F

3

6. Attach the ground wire to the side of the subscriber’s 

premises with stainless steel half moon clamps or tie-wrap the 
ground wire to the riser conduit of the Buried Fiber Drop. 

7. Clean the Multi Grounded Neutral (MGN) connector with 

emery cloth to ensure a stable connection.

8. Attach the ground wire from the NID to the MGN connector 

with the appropriate UL approved ground clamp/fitting.

9. Coat the connection with a metal corrosion preventative.

10. Attach a Warning Ground Tag to the grounding connection.

f

     

CAUTION!

Align the captive screw on the bottom of the ONT with the screw 
hole on the Ground Bar and tighten (refer to 

Figure 11

) to ensure 

grounding for the ONT. This should be the last step before closing 
the NID.

Install the ONT

To install the ONT in the NID Housing, align the hinges on the ONT 
with the snaps on the NID Housing and snap the two together (refer 
to 

Figure 4

).

Figure 4. ONT

Route the Fiber Connection

To route the fiber connection, complete one of the following options:

“OptiTap® NID (P/N: 1187771G1)”

“Fiber Splice SC/APC Bulkhead NID (P/N: 1187770G1)”

g

     NOTE

Clean all optical surfaces before connecting cables.

OptiTap

®

 NID (P/N: 1187771G1)

To install the fiber connection using the Optical Connector, refer to 

Figure 5

, and complete the following steps.

Figure 5. Optical Connector

1. Route the incoming fiber cable through the port identified in 

Figure 1

.

2. Connect the optical connector.
3. Connect a fiber jumper from the top of the optical connector to 

the bottom of the SC/APC connector located at the bottom 
edge of the ONT.

4. Route the fiber jumper so that when the ONT is

 

closed, the 

fiber is not pinched.

Fiber Splice SC/APC Bulkhead NID (P/N: 1187770G1)

To install the fiber connection using the bulkhead connector, 
complete the following steps:

1. Route the incoming fiber cable through the port identified in 

Figure 6

.

g

     NOTE

If the fiber cable has a metallic trace wire, do not bring the trace 
wire inside the NID housing. It is recommended to cut off the trace 
wire at least 6 inches from the NID housing and insulate it, or cut off 
the trace wire and bury underground.

Figure 6. SC/APC Bulkhead Connector

Optical

Connector

Fiber Jumper

(Route as Shown)

BulkHead Connector

Fiber Tray

Incoming Fiber

Cable

Note:
Connect the Fiber Jumper
to the BulkHead Connector

Содержание 1287802F1

Страница 1: ...SS 1 LASER PRODUCT INSTALLATION This section explains how to install the NID ground the NID route and attach the incoming Fiber and install the ONT in the NID There is also a section on connecting POTS and Ethernet services After unpacking the ONT inspect it for damage If damage is noted file a claim with the carrier and then contact ADTRAN For more information refer to the warranty f WARNING Read...

Страница 2: ...data the connection to the ONT is through the RJ 45 Ethernet connector For POTS the connection is made through 2 4 Two screw Terminal Bridges 2 for the 452 and 4 for the 454 or RJ 11 connections Installation Steps To install the ONT complete the following steps Mount the NID Enclosure Ground the NID Install the ONT Route the Fiber Connection Connect Power Alarm Install a Local Power Source Install...

Страница 3: ...Splice SC APC Bulkhead NID P N 1187770G1 g NOTE Clean all optical surfaces before connecting cables OptiTap NID P N 1187771G1 To install the fiber connection using the Optical Connector refer to Figure 5 and complete the following steps Figure 5 Optical Connector 1 Route the incoming fiber cable through the port identified in Figure 1 2 Connect the optical connector 3 Connect a fiber jumper from t...

Страница 4: ... 9 Power Alarm Connection and Routing 3 Terminate the 2 power leads Pins 6 and 7 and the five Uninterruptible Power Supply UPS leads see the pinout table 4 Connect the Power Alarm connector to the bottom of the ONT refer to Figure 8 5 Tie wrap and route these wires as shown in Figure 10 This will prevent the connector from coming loose when the ONT is closed Figure 10 Power Alarm Connector Install...

Страница 5: ...in any other fashion may cause harmful interference to radio communications ans is in violation of the FCC Rules part 15 CLEI TEL NUMBER PWR GPON POTS1 POTS2 POTS3 POTS4 Ethernet Connections POTS Connections Two Post Bridge Cable Routing Area POTS and Ethernet Port Captive Screw 2 Trim each wire to length 3 Connect the tip and ring wires to the terminal bridges 4 Insert the RJ 11 connectors from t...

Страница 6: ...r dial tone and flashes the GPON LED green for approximately 10 seconds with a cadence of 300 milliseconds on off before it continues its startup ranging process g NOTE If a failure occurs the ONT plays reorder tone and displays Invalid on the caller id display If the pattern is entered incorrectly the caller id displays Re enter if the first ID does not match the second Entering an invalid Regist...

Отзывы: