HDSL T200 HTU-R, Span Powered, 60 mA Installation and Maintenance Practice
24
61247026L1-5A
Self Test Options Screen
The Self Test Option screen, illustrated in
, allows the initiation of self tests of the
T200 HTU-R, SP/60 mA and HTU-C by pressing “
S
.”
Figure 11. Self-Test Options Screen
Circuit ID:HNTSVLALHDSL MM/DD/YY hh:mm:ss
SELF-TEST
Press “S” to initiate HTU-C and HTU-R self-tests.
Press “M” to return to the Main Menu.