CS2 SERIES
–OPERATION MANUAL(EN)-A-2017-11-16
8 / 41
Please according to the numbers to do the field
calibration (
)
R L 1
RL 2
2
RL3
RL4
COM
CI1
1
CI2
CI3
ENT/FN
▲
▲
▼
Kg
2
caLlo
caLls
3
5
caLhi
caLhs
6
4
Calibration
Low
Calibration
High
1
2
3
4
5
6
1
■
Bank Function(Suffix-3BK) for CS2-VA, CS2-RS
The function is for CS2-VA and CS2-RS for controlling difference process with a same meter.
For example; a pressure testing equipment; it has to measure multi-range with difference pressure transducers. The
meter can be pre-set 4 groups parameters to show difference scales and relay energized with difference set-points.
The operator just selects the bank number (bank1) to meet the process (product A). To make easier operating and to
avoid making mistake in process operating.
4 banks pre-set for all relay functions are correspondence to 4 difference scaling, decimal point, above select by 3
External Control Inputs(E.C.I.) or front key.
Example: Current testing
Product A: Current rated: 5A; NG: over 5A
Product B: Current rated: 100A; NG: over 100A
Setting: BANK1:
[
dp
]
:
)000
[
lOsc
]
:
)000
[
hIsc
]
:
%000
[
ry!md
]
:
hi
[
ry!sp
]
:
%000
[
ry!rd
]
:
)0)5
BANK2:
[
dp
]
:
)00
[
lOsc
]
:
)00
[
hIsc
]
:
10)00
[
ry!md
]
:
hi
[
ry!sp
]
:
10)00
[
ry!rd
]
:
)0!0
[
ecI1
]
:
banK1
[
ecI2
]
:
banK2
; connect a selector (or DO of PLC) to ECI1 and ECI2 terminals
●
The order want to produce Product A must switch selector to A(Label A on panel), and ECI.1 close that the square
green LED bright to express the meter will work as per bank1 set. When PV is over 5.000A that relay1 will be
energized.
●
The second order want to produce Product B must selector to B(Label B on panel), and ECI.2 close that the square
green LED bright to express the meter will work as per bank2 set. When PV is over 100.00A that relay1 will be
energized..
Only 1 Bank can be selected, if it is double selection. The priority is Bank1 > Bank2 > Bank3 in order,