![ADS-tec StoraXe PowerBooster GSS0608 Скачать руководство пользователя страница 56](http://html1.mh-extra.com/html/ads-tec/storaxe-powerbooster-gss0608/storaxe-powerbooster-gss0608_manual_2853829056.webp)
Brief description of system components
Page
34
of
72
GSS0608
Version: 1.3
6.3 Inverter
6.3.1 Scope of delivery
Two
30 kVA bi-directional inverters with
power section and control unit have been integrated for the
storage system.
The inverter transfers electrical power from the public grid to a battery and back. It is the interface between
AC (public grid) and DC (battery system) and operates bidirectionally to charge and discharge the battery
system.
The inverter can be used in current-regulated grid-connected mode.
6.3.2 Safety instructions
CAUTION
Risk of death due to high residual voltage!
The AC supply must be switched off before any work is performed on the system,
otherwise a potentially fatal electric shock can occur.
Before starting work, make sure that the AC supply of the supply lines to the
system is switched off and secured to prevent it from being switched on again
inadvertently.
Observe a waiting period of 5 minutes to reliably exclude residual voltages.
After opening the door, set the main switch to the
OFF
position.
Switch the key switch on the SRC4310 to OFF
Check that the system is de-energised.
Comply with the technical regulations for working on electrical installations.
NOTE
Observe qualifications.
All work must be performed by qualified and specially trained personnel only!
When carrying out work (e.g. installation work at the device), make sure that the
units concerned are in a secured and de-energised condition, and wear
personal protective equipment.
It is essential to follow the instructions from the manufacturer (see Applicable
Содержание StoraXe PowerBooster GSS0608
Страница 1: ...StoraXe PowerBooster Compact storage system GSS0608 ...
Страница 4: ......
Страница 14: ...Preliminary information Page 10 of 14 GSS0608 Version 1 3 6 Bottom view of unit ...
Страница 15: ...Preliminary information Page 11 of 14 GSS0608 Version 1 3 7 Checklist for commissioning ...
Страница 16: ...Preliminary information Page 12 of 14 GSS0608 Version 1 3 ...
Страница 18: ...Preliminary information Page 14 of 14 GSS0608 Version 1 3 9 Appendix Extract of the electrical diagram ...
Страница 21: ......
Страница 22: ......
Страница 118: ......
Страница 120: ......
Страница 121: ......
Страница 122: ......
Страница 123: ......
Страница 124: ......
Страница 125: ......
Страница 126: ......
Страница 127: ......
Страница 128: ......
Страница 129: ......
Страница 138: ......
Страница 139: ......