Machine Installation TFX3
Chapter 3
8
1.
Carefully remove the Cabinet from the shipping container giving yourself enough
space.
2.
Move the cabinet to the desired location
3.
Some TFX3 are shipped in 2 parts, insert the top part. (see fig 1)
4.
Insert the 3 fluorescent kits in the blue tubes (see fig 2)
5.
Open the coin doors and plug in all 3 plugs from the fluoresrencent to the main power
strip
6.
Locate the power cord, you have 2 options: insert the power cord to the bottom of the
machine to power it from a floor outlet or run an extension cable through one of the
blue tube to power it from the ceiling.
7.
Hang on screen to the support, insert the 4 bolts and then adjust to the desired height
(normaly in the middle position). Do the same for all the other screens (fig 3)
8.
Plug in the connectors between stand and screen (USB, Network, AC Power, and DC
power)
Fig. 1
Fig. 2
Fig. 3