9
MAINTENANCE
maintenance in aDor authorized representatives’ workshops requires pay-
ment. it is carried out in accordance with the schedule and the representative’s
rates. During the maintenance the owner must show a warranty certificate.
IMPORTANT!
The first check-up is carried out in 1 month after installation.
after the check-up a specialist makes a note about performance of work on
page 12.
IMPORTANT!
If drive operation is accompanied by knocks, clicks, scraping, door
vibration, please contact ADOR authorized representatives imme-
diately.
DISPOSITION Of SLIDING DOOR INDEx PINS AND cONTAcTS
Tenon of the sliding
door index pin
Movable
contacts group
Places for
applying
grease
(WD-40)
Mortise of the sliding
door index pin
Fixed contacts group
Places for
applying
grease
(Lietol-24)
Содержание Croco
Страница 14: ...12 SERVICING PAGE Check up date Description of work and list of spare parts Work carried out by Name Signature ...
Страница 15: ...13 SERVICING PAGE Check up date Description of work and list of spare parts Work carried out by Name Signature ...
Страница 16: ...14 SERVICING PAGE Check up date Description of work and list of spare parts Work carried out by Name Signature ...
Страница 17: ...15 SERVICING PAGE Check up date Description of work and list of spare parts Work carried out by Name Signature ...