background image

viii

List of Figures

Leading

EDGE COMPUTING

This page intentionally left blank.

Содержание PXES-2301

Страница 1: ...Leading EDGE COMPUTING PXES 2301 6 slot PXI Express Chassis User s Manual Manual Rev 1 2 Revision Date September 24 2020 Part No 50 17053 1010...

Страница 2: ...ng EDGE COMPUTING Revision History Revision Release Date Description of Change s 1 0 2017 08 24 Initial Release 1 1 2020 06 17 Update specifications add TUV safety content 1 2 2020 09 24 Removed secti...

Страница 3: ...even if advised of the possibility of such damages Environmental Responsibility ADLINK is committed to fulfill its social responsibility to global environmental preservation through compliance with th...

Страница 4: ...s properly NOTE NOTE Additional information aids and tips that help users perform tasks CAUTION Information to prevent minor physical injury component dam age data loss and or program corruption when...

Страница 5: ...ing Started 17 2 1 Package Contents 17 2 2 Cooling Considerations 18 2 3 Hardware Installation 22 2 3 1 Installing the System Controller 22 2 3 2 Installing Peripheral Modules 26 2 4 Rack Mounting 28...

Страница 6: ...and Maintenance 41 A 1 Installation Problems 41 A 2 Basic Troubleshooting 42 A 3 Maintenance 42 A 3 1 Handling the Chassis 42 A 3 2 Cleaning the Exterior 43 A 3 3 Power Requirements 43 Important Safet...

Страница 7: ...Panel 11 Figure 1 9 PXES 2301 PCIE Topology 12 Figure 1 10 PXES 2301 Backplane 13 Figure 1 11 Trigger Bus Bridge Capability 15 Figure 2 1 Cooling Clearances 21 Figure 2 2 Single Rack Mount Assembly 29...

Страница 8: ...viii List of Figures Leading EDGE COMPUTING This page intentionally left blank...

Страница 9: ...List of Tables ix PXES 2301 List of Tables Table 1 1 Power Requirements 2 Table 1 2 Front Rear Panel Legend 11 Table 1 3 Front Panel LED Indicators 12 Table 3 1 Target Temperature Parameters Legend 37...

Страница 10: ...x List of Tables Leading EDGE COMPUTING This page intentionally left blank...

Страница 11: ...including fan speed system voltages and internal temperature Compact rugged half rack size with efficient construction uniquely suits the PXES 2301 for portable use with minimized space requirements A...

Страница 12: ...ions with the PXES 2301 power sup ply meeting the low power standard and providing interopera bility between modules and chassis Power rail specifications follow and are further detailed in the PXI 5...

Страница 13: ...25 ppm Maximum slot to slot skew 100 ps Accuracy 25 ppm Fans 2 sets of 100 2CFM fans Per slot cooling capacity 38 2 W verified by 50 C chamber test Slots 6 total as follows 1x PXI Express system slot...

Страница 14: ...500 Hz 0 21 Grms 3 axes Nonoperating 5 to 500 Hz 2 46 Grms 3 axes Sound Pressure Level at operator position Tested in accordance with ISO 7779 Auto fan up to 25 C ambient w no peripheral slot occupie...

Страница 15: ...Introduction 5 PXES 2301 1 3 Schematics Figure 1 1 Front View NOTE NOTE All dimensions are shown in mm millimeters 177 8 15 10 5...

Страница 16: ...6 Introduction Leading EDGE COMPUTING Figure 1 2 Left Side View Figure 1 3 Right Side View 319 6 177 8 192 8...

Страница 17: ...Introduction 7 PXES 2301 Figure 1 4 Rear View...

Страница 18: ...8 Introduction Leading EDGE COMPUTING Figure 1 5 Top View...

Страница 19: ...Introduction 9 PXES 2301 Figure 1 6 Underside View...

Страница 20: ...10 Introduction Leading EDGE COMPUTING 1 4 Connectors I O and Controls 1 4 1 Front Rear Panels Figure 1 7 PXES 2301 Front Panel A B...

Страница 21: ...hassis Status LED Temperature Fan and Power L to R functions See Front Panel LED Indicators on page 12 C Fan Switch In HIGH position fans operate at maximum speed in AUTO fans run based on monitored c...

Страница 22: ...al Chassis is powered down Chassis is powered down Blinking One or more temperature sensors exceeds threshold temperature default 70 C One or more fans falls below threshold speed default is 800RPM On...

Страница 23: ...Express specifications The backplane routes three system slot x4 PCI Express links to 2nd to 4th peripheral slots directly The fourth link is routed to a PCI Express switch divided to x4 PCI Express...

Страница 24: ...unctionality excluding DSTAR and PXI Star and 32 bit PXI functionality Local Bus The local bus on a PXI backplane is a daisy chained bus that connects each peripheral slot with adjacent peripheral slo...

Страница 25: ...d differential 100MHz clock PXIe_CLK100 to each peripheral slot for inter module syn chronization The independent buffers drive the clock signal to each peripheral slot These common reference clock si...

Страница 26: ...16 Introduction Leading EDGE COMPUTING This page intentionally left blank...

Страница 27: ...the following items are included in the pack age PXES 2301 Chassis Power cords Filler panel kit for unused reserved slots including five 1 slot panels Quick Start Guide If any of these items are missi...

Страница 28: ...ding EDGE COMPUTING 2 2 Cooling Considerations Two 100 2CFM fans on the underside of the PXES 2301 draw cool air through apertures on the bottom and over the PXI PXIe modules to be exhausted through t...

Страница 29: ...in height of the rubber feet on the underside must be maintained to allow air intake The PXES 2301 smart fan control system detects the inner chas sis temperature related to intake air temperature as...

Страница 30: ...nal setup chassis direc tion cannot be configured with the right side carrying handle on the bottom which can impede cooling functions NOTE NOTE To sustain required air flow always install provided fi...

Страница 31: ...Getting Started 21 PXES 2301 Figure 2 1 Cooling Clearances 44 45 44 45 10 5 44 45 44 45...

Страница 32: ...the System Controller The PXES 2301 incorporates a system controller slot supporting a PXI Express system controller of up to 4 slot width 1 Ensure the CPU memory module s and storage device s are pr...

Страница 33: ...Getting Started 23 PXES 2301 3 Depress the system controller module s latch to release...

Страница 34: ...ted Leading EDGE COMPUTING 4 Align the module s top and bottom edges with the card guides and carefully slide the module into the chassis 5 Lift the latch until the module is securely seated in the ch...

Страница 35: ...Getting Started 25 PXES 2301 6 Fasten the screws on the module front panel and con nect all devices to the system controller...

Страница 36: ...he PXE 2301 supports up to five peripheral modules including a system timing module 1 Select an available peripheral slot 2 to 6 2 Depress the peripheral module s latch and align the module s top and...

Страница 37: ...Getting Started 27 PXES 2301 4 Lift the latch until the module is securely seated in the chassis backplane...

Страница 38: ...ditional PXI or PXES peripheral modules 2 4 Rack Mounting ADLINK provides hardware for optional installation of the PXES 2301 to a rack The kit order name PXES 2301 Rack Mount Kit NOTE NOTE To improve...

Страница 39: ...PXES 2301 flexibly recesses the PXES 2301 in the rack accommodating external mechanical parts on the front side such as cables and mass interconnect modules 2 4 1 Single Rack Mount Figure 2 2 Single R...

Страница 40: ...lace screws in the holes marked R Figure 2 3 Right Side Bracket Mounting Holes And for the left side bracket use the holes marked L Figure 2 4 Left Side Bracket Mounting Holes 1 Remove carrying handle...

Страница 41: ...g four screws not included 2 4 2 Powering On the System The PXES 2301 is equipped with a 100 VAC to 240 VAC universal power supply unit requiring no input voltage selection 1 Connect one end of the su...

Страница 42: ...32 Getting Started Leading EDGE COMPUTING This page intentionally left blank...

Страница 43: ...slot 1st slot 3 1 Installing the Monitor Utility Download the ADLINK PXI platform service package including system monitoring utility from http www adlinktech com Double click Setup exe to install an...

Страница 44: ...itoring utility is divided into Connect Control Remote Status Control and Chassis Status categories Figure 3 1 ADLINK ChassisWatch for PXES 2301 3 2 1 Connect Control Selecting Connect reserves system...

Страница 45: ...nds Selecting Start begins the log Over Threshold Statistics when selected displays statistics exceeding the threshold Save Load Threshold All Threshold Control settings can be saved or loaded here Se...

Страница 46: ...set to AUTO fans run at different speeds based on the measured temperature Target Temp indicates the temperature at which fans run at 100 Using the default fan curve as an example fans run at 30 when...

Страница 47: ...settings including DC voltage temperature and fan speeds The updated threshold setting can also be set here by entering the desired value and select ing Set Threshold Settings Mark Temperature Event A...

Страница 48: ...The status displays as normal when the readings are within the threshold range and abnormal when the thresh old range is exceeded Chassis Temperature Temperature sensors T1 to T3 located inside the ch...

Страница 49: ...01 Figure 3 4 Chassis Temperature Sensors Fan Speed Displays monitored readings of the two cooling fans Status displays as normal when readings exceed threshold value and abnormal when the readings fa...

Страница 50: ...40 Chassis Monitoring Leading EDGE COMPUTING This page intentionally left blank...

Страница 51: ...ly installed and secured All peripheral modules are properly seated on the slots All cables are properly connected to the system controller and peripheral modules All installed peripheral modules are...

Страница 52: ...chassis power connector and wall socket power strip The wall socket power strip is live No video output in the external display The external display is functioning properly Display settings support e...

Страница 53: ...e dust or dirt such as the area in and around the chassis and power supply air intake apertures A 3 3 Power Requirements Make sure that the power cord is in good condition before plugging it into the...

Страница 54: ...44 Troubleshooting and Maintenance This page intentionally left blank...

Страница 55: ...n can only be performed by qualified and authorized technicians or personnel Before performing maintenance tasks it is imperative to turn off the power switch and remove the power cord from the unit t...

Страница 56: ...ning or does not function according to the User s Manual The device has been dropped and or damaged and or shows obvious signs of breakage Disconnect the power supply cord before loosening the thumbsc...

Страница 57: ...Important Safety Instructions 47 PXES 2301 BURN HAZARD Touching this surface could result in bodily injury To reduce risk allow the surface to cool before touching...

Страница 58: ...ntretien des quipements L entretien et l inspection ne peuvent tre effectu s que par des techniciens ou du personnel qualifi s et autori s s Avant d effectuer des t ches de maintenance il est imp rati...

Страница 59: ...de r parer l appareil qui ne doit tre entretenu que par du personnel technique qualifi l aide d outils appropri s Une batterie de type lithium peut tre fournie pour une ali mentation de secours ou une...

Страница 60: ...eurs familiers avec les restrictions appliqu es l emplacement les raisons de celles ci et les pr cautions n cessaires Seulement permis par l utilisation d un outil ou d une serrure et d une cl ou d au...

Страница 61: ...408 360 0200 Toll Free 1 800 966 5200 USA only Fax 1 408 360 0222 Email info adlinktech com ADLINK Technology China Co Ltd 300 Fang Chun Rd Zhangjiang Hi Tech Park Pudong New Area Shanghai 201203 Chin...

Отзывы: